The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to test rail signalling cable
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted, and established risk control measures are implemented. Completed |
Evidence:
|
Access times and methods are confirmed to comply with customer requirements and relevant legislation Completed |
Evidence:
|
Service is checked for availability for testing and is isolated/disconnected from use and carriers network/equipment to ensure no equipment damage can occur during testing Completed |
Evidence:
|
Required tests and purpose of tests are identified from site, client documentation and manufacturer specifications Completed |
Evidence:
|
Tools and testing devices needed for cable testing are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Testing devices calibration certification is checked and is current to ensure manufacturers specifications are achieved Completed |
Evidence:
|
Test rail signal cables
|
|
Work area and cable system is made safe for testing and other OHS risk control measures and procedures for carrying out the testing are followed. Completed |
Evidence:
|
Tests are set up and performed in accordance with safety measures and manufacturer specifications. Completed |
Evidence:
|
Test results are read accurately and compared against manufacturers and site specifications for cable performance Completed |
Evidence:
|
Established methods for dealing with unexpected situations are dealt with safely and with the approval of an authorised person Completed |
Evidence:
|
Testing is performed efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Available services are connected and tested for functionality to ensure all previous services have been resumed Completed |
Evidence:
|
Report test results
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Recommendations on actions needed to maintain cable system integrity resulting from cable tests are made and documented Completed |
Evidence:
|
Results of tests are documented accurately and without delay to ensure test results remain current Completed |
Evidence:
|
Site and installation files are updated to ensure traceability of information on system performance is maintained, and relevant reports produced Completed |
Evidence:
|