The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install and maintain power operated point actuating devices
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
The extent of the installation and/or maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Materials needed for the installation and/or maintenance are obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed for the installation and/or maintenance and repair work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Install and maintain power operated point actuating devices
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Maintenance work including cleaning, brushing and lubricating is carried out on point actuating devices to ensure technical and operational specifications are met. Completed |
Evidence:
|
Adjustments to point actuating devices are made to ensure correct operation and perway fastenings and timbers are inspected for conformity to specifications. Completed |
Evidence:
|
The position and mounting of point actuating devices are checked to ensure conformity to site layout specifications. Completed |
Evidence:
|
Installation and maintenance is performed efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
The correct function of the equipment is established from appropriate technical data and equipment operating procedures and maintenance handbooks. Completed |
Evidence:
|
Faulty, worn, damaged or insecure components are replaced, repaired or secured to conform to technical and manufacturers specifications to ensure operational effectiveness. Completed |
Evidence:
|
The equipment is tested using approved testing procedures and equipment to ensure operational and technical requirements are achieved. Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Complete the installation and maintenance of power operated point actuating devices
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Appropriate documentation is accurately completed to provide an accurate installation and maintenance records database and inform train control of work status details. Completed |
Evidence:
|
Reusable, faulty or worn components are tagged and dispatched for repair to maintain adequate spares. Completed |
Evidence:
|
Faulty Perway conditions/components are documented to provide details for corrective action. Completed |
Evidence:
|
Point actuating devices are temporarily taken out of service, instated back into service and certified as appropriate to organisation requirements and procedures. Completed |
Evidence:
|
Maintenance work activities are recorded as per organisation requirements to provide accurate records, and relevant reports produced. Completed |
Evidence:
|