Evidence Guide: UEERA0058 - Plan refrigeration and air conditioning projects

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERA0058 - Plan refrigeration and air conditioning projects

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to plan project

  1. WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Techniques for project planning are reviewed and adopted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project is determined from design brief specifications and/or relevant documentation and discussions with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop project plan proposal

  1. Plant, material, labour and relevant costs are sought and obtained from relevant person/s in accordance with workplace procedures
Plant, material, labour and relevant costs are sought and obtained from relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project budget is determined from estimated plant, material, labour and relevant costs in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Critical path analysis is applied to developing workflow strategies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sources and availability of materials and human resources required for project are determined in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk management strategies are sought, obtained and incorporated in project plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project plan is reviewed and adjusted to rectify any anomalies in accordance with project plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project plan proposal is documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for project plan

  1. Project plan is presented and discussed with relevant person/s
Project plan is presented and discussed with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alterations to the project plan resulting from the presentation/discussion are negotiated with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final project plan is documented and approval obtained from relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

determining the project requirements accurately

establishing a project budget

developing effective workflow strategies

documenting project plan proposal

negotiating alterations to the proposed project plan successfully

obtaining approval of the final plan

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

refrigeration and air conditioning project planning, developing and documenting refrigeration and air conditioning project proposals, milestones and completion methods and techniques, including:

purpose of project planning

documents needed to plan a project

factors influencing sequence and restraints of project activities

critical path and project analysis encompassing:

purpose

essential data

relational sequence of work activities

graphical representation methods

methods of representing time/rates

monitoring methods

refrigeration and air conditioning industry sector customs and practices, safe working practices and relevant standards, codes and regulations

technical aspects of project planning and management encompassing:

method of ensuring equipment meets specified performance requirements

performance/cost-benefit analysis

equipment procurement

typical approaches to planning and management

successful planning techniques

best practice management methods and styles

relevant manufacturer specifications

relevant safe job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Planning refrigeration and air conditioning projects must include the following:

an industry accepted medium-sized refrigeration or air conditioning project