NTISthis.com

Evidence Guide: UEERA0060 - Produce HVAC/R control system diagrams

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERA0060 - Produce HVAC/R control system diagrams

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to produce HVAC/R control system diagrams

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures and workplace procedures are followed in preparation for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work is determined from project specifications and/or discussions with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Software tools and equipment required for work are obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce HVAC/R control system diagrams

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant control diagrams and layouts required are determined in accordance with project specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical data of control system components is interpreted to determine parameters for inclusion in accordance with project specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant software tools are used to produce diagrams in accordance with project specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diagrams are checked for accuracy in accordance with project specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events are dealt with in accordance with workplace procedures and safe work practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report HVAC/R control system diagrams

  1. Completed control diagrams are submitted to relevant person/s for accuracy in accordance with project specifications and workplace procedures
Completed control diagrams are submitted to relevant person/s for accuracy in accordance with project specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alterations, additions and/or corrective instructions are followed and diagrams are re-submitted for final approval in accordance with project specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Copies of completed diagrams are filed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

understanding the extent of the drawing work accurately

determining appropriate types of diagrams and their layouts correctly

including appropriate technical data parameters in the diagrams

checking and correcting diagrams accurately

filing copies of completed drawing securely

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

completing and reporting heating, ventilation and air conditioning/refrigeration (HVAC/R) control system diagrams

preparing to produce HVAC/R control system diagrams

producing HVAC/R control system diagrams.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

HVAC/R control system fundamentals, safe working practices and relevant standards, codes and regulations, including:

control fundamentals:

control terminology

refrigeration system characteristics

HVAC system characteristics

control system characteristics

control system components

control system diagrams and symbols

product knowledge

types of control equipment:

electrical:

classification of circuits

two position control

floating control

sensors

controllers

flow control devices

control systems diagrams

electronic:

operating principles

sensors

controllers

control system diagrams

control systems applications:

refrigeration

air conditioning

air handling system controls

ventilation

heating

building airflow system control

airflow control

singles and multi-zones

chiller/boiler and distribution system control (chilled water, boiler and distribution systems)

relevant manufacturer specifications

relevant safe job safety assessments or risk mitigation processes

relevant software tools and equipment

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Producing control system design diagrams must include at least the following:

two different HVAC/R projects