The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan to install PV power system
|
|
Nature and location of the PV work is determined from documentation, diagrams or relevant person/s to determine the scope of work to be undertaken Completed |
Evidence:
|
WHS/OHS requirements and workplace procedures for a given work area are obtained and applied |
|
Completed |
Evidence:
|
Hazards are identified, risks assessed, control measures and workplace procedures implemented |
|
Completed |
Evidence:
|
Installation and/or alteration of the PV system is planned in consultation with persons effected by the work and sequenced appropriately |
|
Completed |
Evidence:
|
PV array mounting methods and roof orientation is determined in accordance with relevant industry standards |
|
Completed |
Evidence:
|
Location of PV system components is planned within the constraints of the building structure, significants and regulations |
|
Completed |
Evidence:
|
Material for the PV installation work is obtained in accordance with workplace procedures and checked against relevant diagrams and job requirements prior to installation |
|
Completed |
Evidence:
|
Need to test or measure live electrical work is determined in accordance with workplace safety procedures |
|
Completed |
Evidence:
|
Tools, equipment and measuring devices required for the PV installation work are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Install LV PV power system
|
|
Electrical WHS/OHS risk control measures and workplace procedures associated with extra-low voltage (ELV) and LV PV power system are followed Completed |
Evidence:
|
Circuits/machines/plant are checked as isolated in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
PV system components are installed to comply with industry technical standards, job specifications and system requirements and with sufficient access to affect terminations, adjustment and maintenance |
|
Completed |
Evidence:
|
Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements |
|
Completed |
Evidence:
|
Unplanned situations are dealt with safely in accordance with workplace procedures in a manner that minimises risk to personnel and equipment and with the approval of an authorised person |
|
Completed |
Evidence:
|
PV system installation is carried out efficiently without waste of materials or damage to apparatus, circuits, the surrounding environment or services using sustainable energy principles |
|
Completed |
Evidence:
|
Checks of installed apparatus quality and components are undertaken in accordance with workplace procedures |
|
Completed |
Evidence:
|
Complete and report PV installation activities
|
|
Worksite is cleaned and made safe in accordance with workplace procedures Completed |
Evidence:
|
Final inspections and tests are made to the installed apparatus to ensure installation conforms to job requirements, industry technical standards and manufacturer specifications |
|
Completed |
Evidence:
|