The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install ELV stand-alone PV power apparatus and systems
|
|
Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures for relevant work area are identified and applied in accordance with workplace procedures Completed |
Evidence:
|
WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work |
|
Completed |
Evidence:
|
System installation is planned in consultation with others impacted by the work and sequenced appropriately |
|
Completed |
Evidence:
|
Nature and location of the work are determined from documentation or relevant person/s to determine the scope of work |
|
Completed |
Evidence:
|
Sitting limitations and customer system requirements are identified through consultation with relevant person/s |
|
Completed |
Evidence:
|
Energy demand is assessed and recommendations made to the customer for energy efficiency improvements, as necessary |
|
Completed |
Evidence:
|
Suitable system components are specified and selected in accordance with workplace procedures |
|
Completed |
Evidence:
|
Location of system components is planned within the constraints of the building structure and regulations |
|
Completed |
Evidence:
|
Instructions for coordinating work with others is obtained from relevant person/s and applied |
|
Completed |
Evidence:
|
Materials and components required are obtained, pre-assembled, where necessary, and checked against job requirements in accordance with workplace procedures |
|
Completed |
Evidence:
|
Materials and components are prepared for transport to the site and transport is arranged in accordance with workplace procedures |
|
Completed |
Evidence:
|
Tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements |
|
Completed |
Evidence:
|
Install ELV stand-alone PV power apparatus and systems
|
|
Equipment is transported safely to site in accordance with workplace procedures Completed |
Evidence:
|
Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
System components are installed in compliance with technical industry standards, job specifications and requirements, and with sufficient access to enable terminations, adjustment and maintenance |
|
Completed |
Evidence:
|
Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements |
|
Completed |
Evidence:
|
Unplanned situations are discussed with relevant person/s and responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment |
|
Completed |
Evidence:
|
Checks of installed apparatus quality are conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
System installation is conducted minimising waste of materials, damage to apparatus, circuits, the surrounding environment and services using sustainable energy principles |
|
Completed |
Evidence:
|
Complete installation and report installation activities
|
|
Worksite is cleaned and made safe in accordance with workplace procedures Completed |
Evidence:
|
Final checks are conducted to confirm installed apparatus conforms to requirements |
|
Completed |
Evidence:
|
System operation is tested and installation verified as compliant with standards and work specifications |
|
Completed |
Evidence:
|
‘As-installed’ apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures |
|
Completed |
Evidence:
|
Customer is informed of system operation, routine maintenance and limitations |
|
Completed |
Evidence:
|
Documentation required by standards or job specifications is provided to the customer |
|
Completed |
Evidence:
|