The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to coordinate work on micro-grid systems
|
|
Nature of the installation is verified from design documentation and any design concerns identified referred to designer Completed |
Evidence:
|
Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures are identified and applied in accordance with workplace procedures |
|
Completed |
Evidence:
|
Engagement and scheduling of contractors and other experts required for completion of work is arranged, and roles, responsibilities and levels of authority confirmed |
|
Completed |
Evidence:
|
Work is planned in consultation with others impacted by the work and sequenced appropriately |
|
Completed |
Evidence:
|
Location of system components is verified according to design within the constraints of the building structure and regulations |
|
Completed |
Evidence:
|
Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Coordinate installation of micro-grid systems
|
|
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures Completed |
Evidence:
|
Transport of equipment to the site is confirmed in accordance with workplace procedures |
|
Completed |
Evidence:
|
System components are installed by relevant personnel to comply with deign, manufacturer specifications, industry standards and regulatory requirements |
|
Completed |
Evidence:
|
Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project |
|
Completed |
Evidence:
|
Quality checks of installed apparatus are conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
System is programmed by relevant personnel in accordance manufacturer specifications and design |
|
Completed |
Evidence:
|
Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Coordinate fault finding and repair of micro-grid systems
|
|
Nature of reported fault/issue is verified Completed |
Evidence:
|
Circuits/apparatus are confirmed as isolated in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Fault or faults are diagnosed, faulty equipment is identified, and the replacement products required are documented by relevant personnel |
|
Completed |
Evidence:
|
System is made safe, faulty apparatus is dismantled, recorded and stored by relevant personnel in accordance with manufacturer guides and stakeholder instructions |
|
Completed |
Evidence:
|
Repaired or replaced apparatus is assembled by relevant personnel in accordance with manufacturer guidelines, industry standards and regulation |
|
Completed |
Evidence:
|
Testing and re-commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Complete and report work activities
|
|
Work area is cleaned and made safe Completed |
Evidence:
|
‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |
|
Completed |
Evidence:
|