NTISthis.com

Evidence Guide: UEERE0063 - Design off-grid photovoltaic/generating set systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERE0063 - Design off-grid photovoltaic/generating set systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to design off-grid PV/genset system

  1. Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of the off-grid PV/genset system and electrical installation is determined from site survey report and design brief

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety and regulatory requirements to which the electrical installation must comply are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design development work is planned to meet scheduled timelines in consultation with other person/s involved in the off-grid system installation or associated work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop off-grid PV/genset system design

  1. Off-grid PV/genset system performance standards and compliance methods are applied to the design
Off-grid PV/genset system performance standards and compliance methods are applied to the design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety, functionality and budgetary considerations are incorporated in the off-grid PV/genset system design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power and energy management requirements are incorporated in design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design aspects are verified by qualified person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Off-grid PV/genset system design is drafted and checked for compliance with the design brief and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Off-grid PV/genset system design is documented and submitted in line with industry standards and regulations, job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge