The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to work on micro-hydro systems
|
|
WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures Completed |
Evidence:
|
WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work |
|
Completed |
Evidence:
|
Nature, scope and location of the work are determined from documentation or relevant person/s |
|
Completed |
Evidence:
|
Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately |
|
Completed |
Evidence:
|
Engagement and scheduling of contractors and other experts required for completion of work are arranged, and roles, responsibilities and levels of authority confirmed |
|
Completed |
Evidence:
|
Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Install micro-hydro systems
|
|
Nature of the installation is verified from design documentation and any design concerns identified referred to designer Completed |
Evidence:
|
Transport of equipment to the site is confirmed in accordance with workplace procedures |
|
Completed |
Evidence:
|
Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project |
|
Completed |
Evidence:
|
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
System is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance |
|
Completed |
Evidence:
|
Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements |
|
Completed |
Evidence:
|
Quality checks of installed apparatus are conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Worksite is cleaned and made safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |
|
Completed |
Evidence:
|
Maintain micro-hydro systems
|
|
Scope and nature of the maintenance is verified from relevant documentation and relevant person/s Completed |
Evidence:
|
Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
System is dismantled in accordance with manufacturer guides and instructions from relevant person/s |
|
Completed |
Evidence:
|
Component parts are tagged during dismantling to ensure correct and efficient reassembly and stored to protect against loss or damage |
|
Completed |
Evidence:
|
System is reassembled in required sequence with all parts placed, secured and connected in accordance with manufacturer guides or industry practice |
|
Completed |
Evidence:
|
Repairs are completed in accordance with industry standards, regulations and manufacturer specification |
|
Completed |
Evidence:
|
Testing, commissioning and reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
‘As-installed’ system and associated equipment are documented, manuals updated, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |
|
Completed |
Evidence:
|