The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for the installation of battery storage to PCE
|
|
Nature of the installation is verified from design documentation and any design concerns identified are referred to designer Completed |
Evidence:
|
WHS/OHS processes and procedures for work are identified and applied in accordance with workplace procedures |
|
Completed |
Evidence:
|
Hazards associated with battery storage systems are identified and the risk control measures are listed in safe work method statements/job safety analysis |
|
Completed |
Evidence:
|
Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately |
|
Completed |
Evidence:
|
Designer recommendations, relevant industry standards, regulations and manufacturer specifications are identified and applied to planning the system installation |
|
Completed |
Evidence:
|
Material, tools, equipment and measuring devices required for installation are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Install battery storage systems to PCE
|
|
Job safety analysis is undertaken or safe work method statement is prepared and used to inform work processes in accordance with regulations and workplace procedures Completed |
Evidence:
|
Battery storage system components are installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance |
|
Completed |
Evidence:
|
Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements |
|
Completed |
Evidence:
|
System components are programmed in accordance with design, relevant industry standards, regulations and manufacturer specifications |
|
Completed |
Evidence:
|
Quality checks of installed apparatus are conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Worksite is cleaned and made safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |
|
Completed |
Evidence:
|