The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install off-grid power conversion equipment to electrical installation
|
|
Nature of the installation is verified from design documentation and any design concerns identified referred to designer Completed |
Evidence:
|
WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures |
|
Completed |
Evidence:
|
WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work |
|
Completed |
Evidence:
|
System installation is planned in consultation with others impacted by the work and sequenced appropriately |
|
Completed |
Evidence:
|
Location of system components is verified according to design within the constraints of the building structure and regulations |
|
Completed |
Evidence:
|
Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Install off-grid power conversion equipment to electrical installation
|
|
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures Completed |
Evidence:
|
System components are installed to comply with design, manufacturer specifications, industry standards and regulatory requirements |
|
Completed |
Evidence:
|
Wiring is terminated at system components and mandatory tests conducted prior to energisation |
|
Completed |
Evidence:
|
Quality checks of installed apparatus are conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|
System is programmed in accordance manufacturer specifications and design |
|
Completed |
Evidence:
|
Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Worksite is cleaned and made safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |
|
Completed |
Evidence:
|