Evidence Guide: UEERE0081 - Install photovoltaic systems to power conversion equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERE0081 - Install photovoltaic systems to power conversion equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Plan to install PV power system

  1. Nature of the installation is verified from design documentation and any design concerns identified are referred to designer
Nature of the installation is verified from design documentation and any design concerns identified are referred to designer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS processes and procedures for work are identified and applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

PV array mounting methods are verified in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location of PV array components is verified within the constraints of the building structure, design and industry standards and regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material, tools, equipment and measuring devices required for the PV installation are obtained in accordance with workplace procedures and checked against relevant diagrams and job requirements prior to installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install LV PV power array

  1. Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

PV array is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wiring is terminated at components and associated equipment in accordance with manufacturer specifications, and functional and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of installed apparatus are conducted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors