The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for the installation, maintenance or fault finding of battery storage systems for grid-connected PV systems
|
|
Installation design requirements, components and how they interconnect with the different system configurations are identified Completed |
Evidence:
|
Hazards associated with battery storage systems for grid-connected PV systems are identified and the risk control measures are listed in safe work method statements/job safety analysis Completed |
Evidence:
|
Designer recommendations, relevant industry standards, regulations and manufacturer specifications are identified and applied to planning the system installation, maintenance or fault finding Completed |
Evidence:
|
Tools and safety equipment are selected and checked for safe performance of required tasks Completed |
Evidence:
|
Maintenance is planned in accordance with system designer's requirements Completed |
Evidence:
|
PV system and reported faults are identified and fault finding techniques applied Completed |
Evidence:
|
Carry out the installation, maintenance and fault finding of battery storage systems for grid-connected PV systems
|
|
Job safety analysis is undertaken or safe work method statement is prepared and used to inform work processes in accordance with regulations and workplace procedures Completed |
Evidence:
|
Battery storage components are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications Completed |
Evidence:
|
Inverters are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications Completed |
Evidence:
|
System charge controllers are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications Completed |
Evidence:
|
Storage system equipment including, cables, protection and isolation equipment, and signs are installed in accordance with system design documentation, relevant industry standards, regulations and manufacturer specifications Completed |
Evidence:
|
System charge controllers and inverters are programmed in accordance with design documentation, relevant industry standards, regulations and manufacturer specifications Completed |
Evidence:
|
Required modification to the electrical installation is carried out in accordance with design documentation, regulations and relevant industry standards Completed |
Evidence:
|
Maintenance checklists are used to identify items needing servicing or replacement Completed |
Evidence:
|
Required maintenance is performed by servicing or replacing items Completed |
Evidence:
|
Fault finding techniques are applied to correctly diagnose and rectify system faults Completed |
Evidence:
|
Testing, commissioning or reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications Completed |
Evidence:
|
Document the installation, maintenance or fault finding of battery storage systems for grid-connected PV systems
|
|
Testing, commissioning and required compliance documents are completed Completed |
Evidence:
|
As installed, electrical system drawings and equipment location plans are produced Completed |
Evidence:
|
Client system documentation, from designer, is completed Completed |
Evidence:
|
Client is briefed on safe and correct system operation and recommended maintenance Completed |
Evidence:
|
Maintenance checklists are finalised correctly and added to client system documentation Completed |
Evidence:
|
Fault report/record is completed and added to client system documentation Completed |
Evidence:
|