NTISthis.com

Evidence Guide: UEERL0006 - Attach HV flexible cables and plugs

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERL0006 - Attach HV flexible cables and plugs

What evidence can you provide to prove your understanding of each of the following citeria?

Plan to attach flexible cables and plugs

  1. Work is planned, sequenced and prepared in accordance with WHS/OHS requirements and workplace procedures
Work is planned, sequenced and prepared in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Condition and ratings of cables and plugs are determined from relevant industry standards and work instructions from relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flexible cables and plugs are selected in accordance with relevant industry standards and workplace procedure for condition and rating

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials necessary to complete work are obtained in accordance with workplace procedures and checked against work instruction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed to carry out work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach flexible cables and plugs

  1. WHS/OHS policies and procedures are followed
WHS/OHS policies and procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Flexible cables and plugs are prepared without damage to insulation and conductors and in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is earthed in accordance with relevant industry standards and confirmed de-energised

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visual inspection and checks of the electrical equipment and associated wiring are conducted in accordance with workplace procedures to detect any abnormal damage or fault

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approval is obtained in accordance with workplace procedures from relevant person/s before any contingencies are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insulated equipment is inspected and maintained in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conductors are connected to terminals ensuring the required polarity is in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test equipment for operation and safety

  1. HV electrical installation and operation of cables and plugs connected to equipment are inspected and tested in accordance with relevant industry standards, work instructions and workplace procedures
HV electrical installation and operation of cables and plugs connected to equipment are inspected and tested in accordance with relevant industry standards, work instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approval is obtained from relevant person/s to confirm completion of work is in accordance with workplace procedures before supply is connected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Status reports are completed in accordance with established procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant industry standards

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures

applying quality, workplace procedures and instructions

attaching flexible cables and plugs to electrical equipment connected to high voltage (HV) electrical equipment

attaching, replacing and repairing flexible cables and plugs connected to HV electrical equipment

connecting flexible cables and plugs to multi-phase appliances

dealing with unplanned events in accordance with problem-solving techniques and workplace procedures

inspecting and testing flexible cables, plugs and electrical equipment connected to HV electrical equipment for operation and safety

planning and preparing to attach flexible cables and plugs connected to HV electrical equipment

providing status reports.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

flexible cords/cables and plugs to suit given HV applications, including:

flexible cables and plugs to suit given HV applications

types of multi-phase plug HV for a specific load and ingress protection (IP) rating requirements

safety of a HV electrical apparatus (including basic principles of its operation non-mathematical and control) of an appliance for connection to the supply, including:

appropriate test equipment to check that apparatus is safe

procedures to be followed to ensure the correct use of test equipment

basic principles of operation and control of apparatus supplied by the flexible cables and plugs

test results that show apparatus is unsafe

connection of flexible cables and plugs to multi-phase appliances, including:

preparation of flexible cables for connection to HV apparatus

connection of flexible cables to HV apparatus

connection of a HV plug to a flexible cable

safety of flexible cable and plug assembly, including:

plug and cord testing procedures

safe operation of apparatus supplied by HV cable and plug assembly

connection of flexible cables and plugs to multi-phase appliances

flexible cords/cables and plugs to suit given HV applications

problem-solving techniques

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies, procedures and instructions

safety of flexible cable and plug assembly

types of multi-phase plug HV for specific load and IP rating requirements.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Flexible cables and plugs for connecting equipment intended to operate at HV must not include:

where high fault currents are possible

on complex electrical work

competencies associated with fixed wiring