The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install/maintain CBI rail equipment
|
|
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified Completed |
Evidence:
|
Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work |
|
Completed |
Evidence:
|
Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements |
|
Completed |
Evidence:
|
Materials needed for the installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications |
|
Completed |
Evidence:
|
Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Install/maintain CBI rail system
|
|
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed Completed |
Evidence:
|
Reports or fault logs are identified by accessing diagnostic terminal |
|
Completed |
Evidence:
|
Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions |
|
Completed |
Evidence:
|
Records of previously corrective actioned faults are deleted/cleared from the terminal |
|
Completed |
Evidence:
|
Source of the fault is identified by assessing the diagnostics terminal |
|
Completed |
Evidence:
|
Corrective action required is determined and implemented |
|
Completed |
Evidence:
|
Appropriate mechanisms for the safe and efficient rectification of the fault are determined |
|
Completed |
Evidence:
|
Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes |
|
Completed |
Evidence:
|
Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices |
|
Completed |
Evidence:
|
Replacement equipment is obtained from spare stock to comply with identified fault repair requirements |
|
Completed |
Evidence:
|
Faulty component/equipment is identified and removed in accordance with organisation practices and procedures |
|
Completed |
Evidence:
|
Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications |
|
Completed |
Evidence:
|
Correct test procedures are identified and implemented to confirm all operations are within specifications |
|
Completed |
Evidence:
|
Equipment operations are monitored to ensure system integrity |
|
Completed |
Evidence:
|
Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements |
|
Completed |
Evidence:
|
Completed statistical records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance |
|
Completed |
Evidence:
|
Complete CBI rail system installation/maintenance
|
|
WHS/OHS risk control work completion measures and workplace procedures are followed Completed |
Evidence:
|
Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required |
|
Completed |
Evidence:
|
Faulty equipment requiring repair is segregated and appropriate records are completed in preparation for despatching to repairer |
|
Completed |
Evidence:
|
Spare equipment stocks are reviewed to ensure adequate availability |
|
Completed |
Evidence:
|
Priority for repair and/or replacement of equipment is determined by evaluation of stock levels and fault logs |
|
Completed |
Evidence:
|
Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced |
|
Completed |
Evidence:
|