NTISthis.com

Evidence Guide: UEERS0006 - Install and maintain computer-based interlocking rail systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERS0006 - Install and maintain computer-based interlocking rail systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install/maintain CBI rail equipment

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials needed for the installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install/maintain CBI rail system

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reports or fault logs are identified by accessing diagnostic terminal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Records of previously corrective actioned faults are deleted/cleared from the terminal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source of the fault is identified by assessing the diagnostics terminal

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action required is determined and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate mechanisms for the safe and efficient rectification of the fault are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replacement equipment is obtained from spare stock to comply with identified fault repair requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty component/equipment is identified and removed in accordance with organisation practices and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct test procedures are identified and implemented to confirm all operations are within specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment operations are monitored to ensure system integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed statistical records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete CBI rail system installation/maintenance

  1. WHS/OHS risk control work completion measures and workplace procedures are followed
WHS/OHS risk control work completion measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty equipment requiring repair is segregated and appropriate records are completed in preparation for despatching to repairer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Spare equipment stocks are reviewed to ensure adequate availability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Priority for repair and/or replacement of equipment is determined by evaluation of stock levels and fault logs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and includes:

maintaining computer-based and solid-state interlocking (SSI) equipment to operational requirements, plans and specifications

interpreting specifications and plans correctly

using appropriate testing and fault-finding techniques

rectifying faults with minimal disruption to rail traffic and services

using tools and test equipment correctly

following relevant codes of practice, work health and safety (WHS)/occupational health and safety (OHS) and environmental protection procedures requirement

completing relevant technical reports, records and documentation

dealing with unplanned events

applying rail safe working practices and relevant industry standards, codes and rail safety regulations

applying relevant WHS/OHS requirements, including:

implementing workplace procedures and practices

using risk control measures

applying sustainable energy principles and practices

completing installation and maintenance of computer-based interlocking (CBI) system

installing and maintaining CBI system.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

CBI systems installation/maintenance

electronic communications, principles encompassing:

requirements of a basic communications system - satellites, data communications, navigation, telecommunications and noise

antennae and electro-magnetic wave propagation

reason for modulation

amplitude and frequency modulation, difference, advantages and disadvantages

simple transmitter and receiver circuits (block diagram level)

optical communications principles

rail signalling - electronic equipment encompassing:

equipment and their components - telemetry (supervisory control and data acquisition (SCADA)), monitoring systems, IASS, train describer and panel processors

operating principles and parameters

servicing procedures

computer peripherals encompassing:

types and applications

operating principles

software (drivers) installation

network management of peripheral devices

personal computers (PCs), engineering applications and software basics encompassing:

application software types

configurations and preferences

use of particular software packages - word processor, spreadsheet, database, presentation software, web/document publisher, computer-aided design (CAD)/drawing packages, email, and client and business management

rail signalling - CBI encompassing:

equipment and their components - SSI, Microlock and Westrace

operating principles and parameters

servicing procedures

rail signalling - computer applications encompassing:

types of software and their scope - interrogator software for loggers, monitors and CBI and database (work instruction, commissioning work structures and cable schedules)

setting up and use

rail signalling - remote control systems encompassing:

equipment and their components - programmable logic controllers (PLCs), dedicated PCs and prep systems

operating principles and parameters

servicing procedures

electronic equipment

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

safe working practices and relevant industry standards, codes and regulations.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.