The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERS0024 - Install and maintain rail track circuit leads and bonds

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install/maintain track circuit leads and bonds

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks assessed, and control measures and workplace procedures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards that have not previously been identified are noted on job safety assessments and existing risk control measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Any rails or cables with traction return current are identified and protection measures planned

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Missing or broken bonding cables are identified using track circuit bonding drawings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate person/s is consulted to ensure work is coordinated effectively with others involved on the worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation/maintenance instructions are reviewed to obtain clear and concise work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site bonding layout plan is reviewed to clarify bonding requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material to install/maintain track circuit leads and bonds is obtained in accordance with workplace procedures and checked against job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices to install/maintain track circuit leads and bonds are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no unnecessary damage has occurred and complies with job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install/maintain track circuit leads and bonds

  1. WHS/OHS risk control measures and workplace procedures for carrying out work are followed
WHS/OHS risk control measures and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specified leads and bonds are run and positioned appropriately to the formation conditions and to minimise potential damage from track maintenance machines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protection measures for traction return current are implemented prior to removing any cables, bonds or cutting rails

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation/maintenance of track circuit leads and bonds are appropriately sequenced in accordance with job schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Positions of boxes and cable pits are checked to ensure compliance with specifications and appropriate follow-up action is initiated, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components and rail surfaces are prepared to ensure secure and sound connections in accordance with job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Leads or bonds are connected using specified fastening techniques ensuring technical compliance is achieved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Established methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track circuit leads and bonds are installed and connected efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bonds, leads and rail connections are inspected for damage or deterioration and appropriate corrective action is initiated in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate tests are completed to identify components requiring repair or replacement in accordance with workplace procedures and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair or replacement of components is carried out with due regard to train movements and safety of person/s involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Temporary bonding is installed, as required, and electrical readings on bonds/lead connections and insulated rail joints are taken to ensure compliance with specifications and site bonding layout plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track-related equipment is inspected for faults or damage and all faults are documented and appropriate follow-up action is initiated in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation/maintenance of track circuit leads and bonds

  1. WHS/OHS risk control, work completion measures and workplace procedures are followed
WHS/OHS risk control, work completion measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All cables and bonds associated with traction return current are reinstated and no additional bonds or current paths that may impact on track circuit correct operation are present

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-track safe working requirements are removed in accordance with workplace procedures and safety management system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion is documented, relevant reports produced and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge