NTISthis.com

Evidence Guide: UEERS0027 - Maintain computer-based interlocking rail systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERS0027 - Maintain computer-based interlocking rail systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to maintain CBI rail equipment

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of maintenance work is determined from job specifications, drawings and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The version of the signalling data and executive software of the CBI is identified by reference to the engineering records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials needed for the maintenance work are obtained in accordance with workplace procedures and checked against job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed for maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Authorisation to take temporarily out of service or disable systems is obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain CBI rail system

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reports or fault logs are identified and accessed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Records of previously corrective actioned faults are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source of the fault is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action required is determined and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checking that the CBI has the correct version of the signalling data and software is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is checked for the correct version of signalling data and software if applicable part of the CBI equipment is replaced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate mechanisms for the safe and efficient rectification of the fault are determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replacement equipment is obtained from spare stock a required to comply with identified fault repair requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty component/equipment is identified and removed as required in accordance with organisation practices and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct test procedures are identified and implemented to confirm all operations are within specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment operations are monitored to ensure system integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete CBI rail system maintenance

  1. WHS/OHS risk control work completion measures and workplace procedures are followed
WHS/OHS risk control work completion measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirmation that system is functional and that no alarms are present or indicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-track safe working requirements are removed in accordance with workplace procedures and safety management system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty equipment requiring repair is segregated as required and appropriate records are completed in preparation for despatching to repairer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Spare equipment stocks are reviewed to ensure adequate availability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Priority for repair and/or replacement of equipment is determined in consultation with authorised person by evaluation of stock levels and fault logs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge