NTISthis.com

Evidence Guide: UEERS0031 - Maintain rail signalling power supplies

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEERS0031 - Maintain rail signalling power supplies

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to maintain rail signalling power supplies

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks assessed, and control measures and workplace procedures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards which have not previously been identified are noted on job safety assessments and risk control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work and location of power supply are determined by site inspection and from job instructions, specifications and/or diagrams

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Batteries and type within the signalling location and management processes for the associated safety hazards are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials needed for the maintenance work are obtained in accordance with workplace procedures and checked against job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed to maintain power supplies are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Authorisation to take temporarily out of service or disable systems is obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain rail signalling power supplies

  1. WHS/OHS risk control measures and workplace procedures for carrying out work are followed
WHS/OHS risk control measures and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Power supply is checked to comply with technical industry standards, job specifications and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wiring and cable terminations are inspected to comply with technical industry standards, approved design drawings and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection and tests are conducted to ensure maintained power supply complies with job specifications and functions as intended

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance of power supply is carried out efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct functioning of equipment is established from reference to manuals, system specifications and commissioning data

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Batteries are inspected and tested to ensure satisfactory operation and condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faults are identified in accordance with relevant technical information of power supplies and fault-finding techniques

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faulty, worn, damaged or insecure components are replaced, repaired or secured in accordance with manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete rail signalling power supplies maintenance

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirmation that system is functional and that no alarms are present or indicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test results for the batteries and power supplies are recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion is documented, and appropriate person/s notified in accordance with workplace procedures and relevant reports produced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge