Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG109 - Control field pipeline operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan control of pipeline operations

  1. Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures
Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements, work permit/s, resources and workplace procedures for the work are obtained for work site/s and communicated to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied to ensure safe systems of work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are obtained to coordinate and perform work in accordance with regulatory and job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant resources required for the work are identified and obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clients are provided with possible solutions and options within the scope, acceptable cost and job requirements parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the work are briefed and responsibilities coordinated and authorised in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control pipelineoperations

  1. WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures
WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operating conditions, pressures and temperatures of the pipeline are monitored and observed to ensure correct operating parameters are maintained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alarms, codes and hazard warnings are correctly recognised and the correct response strategy is selected and applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remedial action/s are taken to address any shortfalls encountered in the work schedule in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is coordinated to ensure completion in agreed timeframe and to industry standards with a minimum of waste in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down pipeline system and complete relevant documentation

  1. Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures
Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and injuries are reported and followed up as required in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated/cleaned up and confirmed safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shutdown is completed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-shutdown checks are completed, documented and shift handover is conducted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Training Industry Package Companion Volume Implementation Guide.

resources must include at least seven (7) of the following:

process control equipment

station power supply

heaters and heat exchanges

station instrumentation

drawings and schematics

metering equipment and gas analysis equipment

valves, actuators and flanges

compressors and prime movers

sumps and drains

pipeline inspection gauges (PIGs)

monitoring systems must include at least four (4) of the following:

use of fire and gas extinguishing and deluge systems

emergency systems

alarm and communication systems

supervisory control and data acquisition (SCADA)

prime wovers and compression systems

shutdown systems

pipeline faults must include the following:

gas leaks

electrical problems

compressor or pump failure

out-of-current inspection status

gauge failure or hose rupture leaks

instruments out of calibration

non-flow of gas