The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan control of pipeline operations
|
|
Work schedule, drawings, plans, job requirements and material lists are obtained, analysed and confirmed by site inspection, as necessary, and work planned and coordinated in accordance with workplace procedures Completed |
Evidence:
|
Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures |
|
Completed |
Evidence:
|
Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures |
|
Completed |
Evidence:
|
Job requirements, work permit/s, resources and workplace procedures for the work are obtained for work site/s and communicated to relevant person/s in accordance with workplace procedures |
|
Completed |
Evidence:
|
WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied to ensure safe systems of work are followed |
|
Completed |
Evidence:
|
Relevant work permit/s are obtained to coordinate and perform work in accordance with regulatory and job requirements and workplace procedures |
|
Completed |
Evidence:
|
Relevant resources required for the work are identified and obtained in accordance with workplace procedures |
|
Completed |
Evidence:
|
Clients are provided with possible solutions and options within the scope, acceptable cost and job requirements parameters |
|
Completed |
Evidence:
|
Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures |
|
Completed |
Evidence:
|
Person/s participating in the work are briefed and responsibilities coordinated and authorised in accordance with workplace procedures |
|
Completed |
Evidence:
|
Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures |
|
Completed |
Evidence:
|
Control pipelineoperations
|
|
WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures Completed |
Evidence:
|
Hazardous activities are conducted safely in accordance with regulatory requirements and workplace procedures |
|
Completed |
Evidence:
|
Operating conditions, pressures and temperatures of the pipeline are monitored and observed to ensure correct operating parameters are maintained in accordance with workplace procedures |
|
Completed |
Evidence:
|
Alarms, codes and hazard warnings are correctly recognised and the correct response strategy is selected and applied in accordance with workplace procedures |
|
Completed |
Evidence:
|
Remedial action/s are taken to address any shortfalls encountered in the work schedule in accordance with workplace procedures |
|
Completed |
Evidence:
|
Work is coordinated to ensure completion in agreed timeframe and to industry standards with a minimum of waste in accordance with job requirements and workplace procedures |
|
Completed |
Evidence:
|
Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures |
|
Completed |
Evidence:
|
Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards |
|
Completed |
Evidence:
|
Shut down pipeline system and complete relevant documentation
|
|
Emergency shutdown procedures are applied to equipment failure and work undertaken in accordance with workplace procedures Completed |
Evidence:
|
Accidents and injuries are reported and followed up as required in accordance with workplace procedures |
|
Completed |
Evidence:
|
Work site is rehabilitated/cleaned up and confirmed safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
Shutdown is completed in accordance with workplace procedures |
|
Completed |
Evidence:
|
Pre-shutdown checks are completed, documented and shift handover is conducted in accordance with workplace procedures |
|
Completed |
Evidence:
|