NTISthis.com

Evidence Guide: UEGNSG110 - Supervise technical operations for gas distribution or transmission

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG110 - Supervise technical operations for gas distribution or transmission

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to supervise operations

  1. Project activities are planned to prevent further damage and to ensure minimal disruption to gas supply
Project activities are planned to prevent further damage and to ensure minimal disruption to gas supply

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures for work are obtained for all work sites and communicated to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS workplace procedures and environmental and sustainable energy policies and procedures related to the work are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are obtained to coordinate and perform the work in accordance with workplace procedures, regulatory and job requirements and

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, coordinated and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clients are provided with possible solutions and options within the scope, acceptable cost and project requirement parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication issues with relevant stakeholders are resolved and project activities coordinated in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the project work are briefed and responsibilities coordinated and authorised, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project expenditure is forecast, monitored and managed in accordance with operational budget constraints

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise operationsduring project

  1. WHS/OHS risk control measures are followed in accordance with workplace procedures
WHS/OHS risk control measures are followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and systems are inspected, tested and faults identified in accordance with work schedule, job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault finding and troubleshooting techniques are applied to identify repairs or maintenance required in accordance with project job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project work is supervised to ensure completion in agreed timeframe and to industry standards with a minimum of waste in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures, in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of the work are undertaken in accordance with job requirements, workplace procedures and community and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are updated with project status/requirements in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete project work and relevant documentation

  1. Work undertaken is checked against project work schedule for conformance and anomalies and proposed solutions identified and reported to relevant person/s in accordance with workplace procedures
Work undertaken is checked against project work schedule for conformance and anomalies and proposed solutions identified and reported to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and injuries are reported and followed up as required in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated/cleaned up and confirmed safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off in accordance with workplace procedures, job and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project work completion records, reports, documentation and as installed/modified drawing/s are completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

resources must include at least four (4) of the following:

relevant personnel

materials

tools and equipment

personal protective equipment (PPE)

workplace procedures

equipment manuals

training resources

project activities must include at least three (3) of the following:

maintenance, repairs and modifications

construction and upgrade

rectification of gas system faults

installation and commissioning of new plant, piping and equipment

system security

scheduling work

authorities must include at least three (3) of the following:

local and shire councils

local government authorities

road transport authorities

rail departments

landowners both current and traditional indigenous

gas system faults must include at least eight (8) of the following:

gas leaks

electrical problems

mechanical failure

out-of-current inspection status

gauge failure, hose rupture/leaks

instruments out of calibration

non-flow of gas

cathodic protection system failure

corrosion

compressor breakdown

filtration problems

gas measurement equipment inaccuracy/failure

documentation must include at least eight (8) of the following:

contracts and specifications

drawings and plans

manufacturer specifications

work permits

company standard operation and safety procedures

company management plans and policies

hot work permits

company forms and files

WHS/OHS laws and codes of practice

relevant government acts, regulations and codes of practice

environmental legislative requirements

pipeline licenses

quality assurance

commercial agreements

records/reports must include at least four (4) of the following:

relevant documentation

routine inspections (daily readings, monthly checks)

scheduled maintenance activities

mandatory or statutory inspections

hazard and incident reports