Evidence Guide: UEGNSG138 - Install and commission stationary gas fuelled turbine engines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG138 - Install and commission stationary gas fuelled turbine engines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install stationary gas fuelled turbine engine

  1. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and existing risk control measures and workplace procedures are implemented in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards that have not previously been identified are noted on job safety assessments and existing risk control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design specification for proposed gas fuelled turbine engine installation is accessed, analysed, interpreted and confirmed during site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design specification matters requiring clarification are resolved in consultation with designer and relevant gas authorities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formal authority to proceed with installation and commissioning is obtained before commencing work in accordance with regulatory and code of practice requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation is prepared in consultation with person/s affected by work activity and sequenced appropriately in accordance with quality assurance requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope, nature and location of the work is determined from documentation or relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas fuelled turbine engine plant, equipment and component specifications and manufacturer manuals are obtained for planned work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locations of plant, equipment, fuel train pipe-work and components are planned within the constraints of work site, significants and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas fuelled turbine engine materials needed for the installation work are obtained in accordance with design specification and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment, personal protective equipment (PPE) and testing devices needed to for installation and commissioning work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is prepared for installation of gas fuelled turbine engine plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no damage has occurred and complies with job requirements and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install stationary gas fuelled turbine engine

  1. WHS/OHS risk control measures and workplace procedures for carrying out work activities are followed
WHS/OHS risk control measures and workplace procedures for carrying out work activities are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant gas regulator and code of practice recording and reporting requirements are undertaken at appropriate times throughout the work sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas and electrical circuits/machines/plant are isolated in accordance WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stationary gas fuelled turbine engine components, fuel train and associated pipe-work and flue/exhaust systems are installed in accordance with design specification, industry technical standards and regulatory requirements, with sufficient access to affect terminations, adjustment and maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ventilation systems are installed in accordance with design specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical components, wiring enclosures and wiring terminations are installed in accordance with design and manufacturer specifications, and functional and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance and safety inspections of installed turbine engine, equipment, pipe-work, components and accessories are undertaken and defects are rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation is carried out efficiently without unnecessary waste of materials or damage to plant, equipment, pipe-work, components, accessories and the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures, in a manner that minimises risk to personnel and equipment safely and with the approval of an authorised person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission stationary gas fuelled turbine engine

  1. WHS/OHS risk control measures and workplace procedures for carrying out work activities are followed
WHS/OHS risk control measures and workplace procedures for carrying out work activities are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant gas regulator and code of practice recording and reporting requirements are satisfied at appropriate times throughout the work sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas and electrical safety checks and isolation workplace procedures and purging are completed and recorded to manufacturer and relevant authority requirements before testing and commissioning are commenced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational parameters of individual components are tested and adjusted to conform with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Turbine engine operations are tested, first without and then with fuel, adjustments are completed, as necessary, and results recorded in accordance with approving authority requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Exhaust gases are analysed in accordance with relevant industry practice and authority requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning is conducted without waste of materials or damage to apparatus and the surrounding environment or services using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report installation and commissioning activities

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final check of the installed gas fuelled turbine engine is made to verify compliance with job requirements, certification required by relevant gas authorities and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleared and materials disposed of or recycled in accordance with relevant legislation and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned, checked, serviced and stored in accordance with manufacturer recommendations and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

‘As-installed’ gas fuelled turbine engine equipment, components, pipe-work, flue/exhaust systems and accessories are documented, accessed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

gas fuels must be from one (1) the following:

gas gathering lines

gas transmission pipelines

distribution pipeline

consumer gas installations

gas fuels must include one (1) the following:

natural gas

liquified petroleum gas (LPG)

synthetic natural gas (SNG)

bio-gas

waste gas or sewage gas

used as a single gas fuel or part of a dual fuel system