NTISthis.com

Evidence Guide: UEGNSG200 - Conduct butt fusion of large diameter polyethylene gas pipeline systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG200 - Conduct butt fusion of large diameter polyethylene gas pipeline systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to weld polyethylene pipe

  1. Job requirements and workplace procedures for the site are discussed with relevant persons
Job requirements and workplace procedures for the site are discussed with relevant persons

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental and sustainable measures for the site are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work and responsibilities are confirmed with relevant persons in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-start test weld sample is prepared in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm pipe handling and jointing of polyethylene pipe

  1. Pipe and materials hazards are identified, risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
Pipe and materials hazards are identified, risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, tools and personal protective equipment (PPE) required to carry out the work are identified, obtained and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are consulted to ensure the work is coordinated effectively with others involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, plans, diagrams, drawings and resources required to weld and lay polyethylene gas distribution mains are confirmed, scheduled and obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unsuitable or damaged materials including improperly stored materials are rejected/rectified and reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety and emergency response procedures and responsibilities for an incident are checked and confirmed with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site preparation, safety plan, traffic management plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and weld polyethylene gas distribution mains

  1. WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are monitored and followed
WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are monitored and followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Welding and laying of polyethylene gas distribution mains are conducted in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are prepared, aligned, constrained and jointed in accordance with relevant industry standards and workplace procedures without waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned incidents/events are referred to relevant persons for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Welds and safety checks of work and testing of pipework is carried out in accordance with industry standards, work instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work and relevant documentation

  1. WHS/OHS and environmental risk control measures for work completion are followed
WHS/OHS and environmental risk control measures for work completion are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant documentation is completed and provided to appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.