Evidence Guide: UEGNSG207 - Coordinate construction, laying and testing of gas distribution pipelines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG207 - Coordinate construction, laying and testing of gas distribution pipelines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to coordinate pipeline installation

  1. Location of services are verified and alignment of gas main and associated equipment are confirmed, as necessary, by site inspection in accordance with work schedule and workplace procedures
Location of services are verified and alignment of gas main and associated equipment are confirmed, as necessary, by site inspection in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures for the work are obtained for all work sites and communicated to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy policies and procedures related to the work are obtained, applied and communicated with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access, isolate/de-isolate systems and perform the work in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication with authorised person/s, authorities, clients and land-owners is conducted and work coordinated in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate construction, laying and testing of pipelines

  1. WHS/OHS and environment risk control measures, schedule of work and workplace procedures for carrying out work are followed
WHS/OHS and environment risk control measures, schedule of work and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely and currency confirmed in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction, laying and testing of gas distribution pipelines is coordinated to ensure completion in agreed timeframe and to required standards with a minimum of waste in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction, laying and testing work is coordinated in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events encountered when coordinating the construction, laying and testing work are identified and actioned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the coordination of pipeline construction and laying and relevant documentation

  1. Final inspections of work are undertaken, checked against work schedule for conformance and anomalies reported in accordance with workplace procedures
Final inspections of work are undertaken, checked against work schedule for conformance and anomalies reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and injuries are reported, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off and pipeline returned to service in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, reports and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

tools and equipment must include at least three (3) of the following:

excavation

trenching

shoring

stitch bore

horizontal drilling

directional drilling

pipe connections must include at least four (4) of the following: :

nylon (polymide) pipeline laying techniques

nylon gluing

connection of nylon to other materials

nylon stop off

unplasticised polyvinyl chloride (uPVC) pipeline laying techniques

uPVC solvent cemented joints

uPVC moulded joints

uPVC stop off

uPVC couplings or flanges

connection of uPVC to other material

procedures must include at least five (5) of the following:

polyethylene (PE) pipeline laying techniques

large diameter PE

PE electro fusion

PE butt fusion

saddle fusion

socket fusion

PE stop off

compression couplings or flanges

connection of PE to other materials

practical application of installation and maintenance of plastic pipe systems

procedures must include at least two (2) of the following:

steel pipeline coating repair

steel pipeline coating testing (jeeper)

steel, field joint coating

procedures must include at least three (3) of the following:

connection of PE to steel mains

steel mains welding

steel mains repair

sleeve application

clamp application

hot tap and stopple

isolation methods must include at least two (2) of the following:

high pressure stop off

bagtube

squash off jacks

squash off pliers