Evidence Guide: UEGNSG220 - Construct and lay polyethylene gas distribution mains

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG220 - Construct and lay polyethylene gas distribution mains

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to construct and lay polyethylene gas distribution mains

  1. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements, including alignment of main and services and workplace procedures for the site, are discussed with relevant person/s to confirm the work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work and level of responsibility under the relevant work permit and/or notification is confirmed with relevant person/s in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, tools and personal protective equipment (PPE) required to carry out the work are identified, obtained and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are consulted to ensure the work is coordinated effectively with others involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, plans, diagrams, drawings and resources required to construct and lay polyethylene gas distribution mains are confirmed, scheduled and obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety and emergency response procedures and responsibilities for an incident are checked and confirmed with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Third-party issues are referred to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with job instructions, workplace procedures and traffic management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and lay polyethylene gas distribution mains

  1. WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed
WHS/OHS and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation bed/trench is prepared for laying of polyethylene gas pipe in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction and laying of polyethylene gas distribution mains are conducted in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are prepared, aligned, constrained and jointed in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is carried out to the required standard, without waste of materials or damage to apparatus, equipment, and the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risks, incidents and accidents are reported to the immediate authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events are referred to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of work and testing of pipework is carried out in accordance with industry standards, work instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work and relevant documentation

  1. WHS/OHS and environmental risk control measures for work completion are followed
WHS/OHS and environmental risk control measures for work completion are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant documentation is completed and provided to appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.