Evidence Guide: UEGNSG229 - Prepare simple drawings of as laid gas mains and services

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG229 - Prepare simple drawings of as laid gas mains and services

What evidence can you provide to prove your understanding of each of the following citeria?

Plan to prepare simple drawings of as laid gas mains and services

  1. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Types of drawings required and key features, symbols and abbreviations for each type of plan and drawing used in the gas industry are identified in accordance with the scope and standard of work being undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawing requirements and needs are determined from work instructions and confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client issues in relation to the drawing requirements are clarified and resolved in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, tools and apparatus for producing drawings are identified, obtained and checked for correct operation prior to commencing work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare drawings of as laid gas mains and services

  1. Site inspection is conducted, as required, and factors that may impact on technical drawings, including orientation, altering landscapes, building structures or temporary land marks are identified
Site inspection is conducted, as required, and factors that may impact on technical drawings, including orientation, altering landscapes, building structures or temporary land marks are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Starting point and cross reference points are established and measurements from the starting point, distances and off sets taken and recorded in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

As laid pipework is drawn to scale on graph paper using industry standard drawing conventions in accordance with relevant codes and technical industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fittings that effect the off-set or depth of the pipework, including elbows and tees, are indicated on the drawing as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Additional fittings that need to be recorded in line with drawing specifications, including in-line valves and tapping tees, are indicated on the drawing, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All dimensions, including off-sets, distances, directions, pipe diameter, symbols and abbreviations are included on the drawing in accordance with job specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Standard drawing conventions are used to correct original job drawing to show final as laid arrangement in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of work and testing of pipework is conducted in accordance with industry standards, work instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work and relevant documentation

  1. Additional documentation is completed, including district plan number, network area, street name, pressure ratings, pipe size and type, date laid and additional comments, as required, in accordance with job requirements
Additional documentation is completed, including district plan number, network area, street name, pressure ratings, pipe size and type, date laid and additional comments, as required, in accordance with job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings are finalised and signed off/closed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All drawings and forms are completed and submitted to appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.