NTISthis.com

Evidence Guide: UEGNSG319 - Custody transfer metering and gas quality analysis

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG319 - Custody transfer metering and gas quality analysis

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for the calibration of custodytransfer metering or gas quality measuring equipment

  1. Work requirements for calibration of gas measuring devices are identified and interpreted from plans, equipment specifications and instructions
Work requirements for calibration of gas measuring devices are identified and interpreted from plans, equipment specifications and instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant measuring equipment requirements and workplace procedures for equipment work are communicated to appropriate persons

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and workplace procedures related to work to be performed are obtained, confirmed and communicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced following consultation with person/s for completion within acceptable timeframes and in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk control measures for identified hazards are prioritised, implemented and monitored against the work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access, isolate/de-energise systems and perform work in accordance with workplace requirements and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources, equipment, tools, calibration gases and personal protective equipment (PPE) required to conduct work are obtained and confirmed to be in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measurement equipment is tested and calibrated within calibration tolerances in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication with authorised persons, authorities, clients and land owners are undertaken to resolve issues and coordinate gas work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Persons participating in work are fully briefed and respective responsibilities confirmed, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect, validate and calibrate custody transfer metering and gas quality measuring equipment

  1. Information on device and equipment performance is collected and reported in accordance with workplace procedures
Information on device and equipment performance is collected and reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dealing with customers is consistent with workplace procedures and the specific needs of customers are identified and considered in targeting client service

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection, validation and calibration of custody transfer metering and gas quality measuring equipment is undertaken to ensure completion in an agreed timeframe and to industry quality standards with a minimum of waste in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine inspections of system are scheduled and monitored in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised and hazards are assessed WHS/OHS risks are reported to the authorised persons for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measuring equipment is calibrated against relevant industry standards using correct calibration devices, equipment, techniques and are undertaken within the scope of workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Deviations of measuring results are resolved in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of gas quality are undertaken in accordance with given instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Return to operational service of custody transfer metering and gas quality measuring equipment

  1. Equipment is returned to operational service in accordance with workplace procedures
Equipment is returned to operational service in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Anti-tamper seals are replaced and tagging removed in accordance with workplace procedures, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, reports and documentation are finalised and processed and appropriate persons notified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

constants and variables must include the following:

calibration skills used in the setting, adjustment, calibration validation or verification of instrumentation sensors

measurement principles

gas chromatography

recording and reporting

equipment

organisational and statutory requirements

auxiliary control system must include the following methods:

wide open monitor operation

two stage pressure reduction with monitor override

competency must include the following device:

remote terminal unit (RTU) control of regulators

operation and maintenance of pressure controllers, operation, maintenance must include at least two (2) of the following:

commissioning/setting

troubleshooting

pressure boosters minor repairs

types/models

regulator must include at least two (2) of the following:

sleeve types

control valves

diaphragm types

hydraulic plug types

valve maintenance and operation must include the following:

ball, plug, gate instrument and butterfly valves

metres must include at least three (3) of the following:

diaphragm meters

rotary meters

turbine meters

ultrasonic

orifice plates

coriolis

oil changing

tools/equipment procedures must include at least three (3) of the following:

operational checks

single run units

dual run units

city gates

district regulators

field regulators

full maintenance activities

tools/equipment/procedures must include at least three (3) of the following:

pressure alterations

industrial units

city gates

regulator stations

distribution mains

tools/equipment/procedures must include at least three (3) of the following:

flaring and purging

industrial units

city gates

regulator stations

distribution mains

tools/equipment/procedures must include at least three (3) of the following:

overpressure protection systems function and operation (OPSO)

internal pressure relief systems

pressure relief valves

slam shut systems

valve actuator and control systems

documentation/paperwork must include the following:

risk assessments

completing work sheets

notifications and work permits

equipment checklists

meter bypass forms

service orders

pressure recording charts