Evidence Guide: UEGNSG327 - Coordinate transmission pipeline construction operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG327 - Coordinate transmission pipeline construction operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan for gastransmission pipeline construction activities

  1. Work instructions are obtained and confirmed with relevant personnel
Work instructions are obtained and confirmed with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS), environmental and sustainable energy workplace policies and procedures are followed for gas transmission pipeline work to be performed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed and control measures are prioritised, implemented and monitored, including emergency exits kept clear in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alignment sheets are used to determine construction operations, and work schedule is checked for quality outcome and to minimise risk and damage to property, commerce and stakeholders in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is inspected and assessed using appropriate resources to determine requirements in accordance with workplace procedures and relevant requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job safety analysis (JSA)/safe work method statement (SWMS) briefing is undertaken to determine the tasks, and associated hazards, risks and controls with all relevant persons to confirm work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of responsibility in accordance with relevant work permit is determined and confirmed in accordance with workplace procedures and relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources, relevant procedures, competent personnel, plant, equipment, tools and personal protective equipment (PPE) required for the job are obtained and in working order in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Responsibilities for first aid and other emergency incidents at the work site are checked and confirmed in accordance with job requirements and workplace emergency response procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client issues are referred to relevant person/s in accordance with relevant industry and community standard/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate gaspipeline operations

  1. WHS/OHS workplace policies, procedures and SWMS are followed to eliminate or minimise workplace incidents and hazards
WHS/OHS workplace policies, procedures and SWMS are followed to eliminate or minimise workplace incidents and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting, climbing, working aloft, and use of tools and equipment, techniques and practices are safely followed in accordance with workplace procedures and JSA/SWMS

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is made safe and gas pipeline construction activities are coordinated in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas pipeline construction activities are carried out to agreed timeframe, relevant industry quality standards and with a minimum of waste in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational hazards and safety risks are reported to the relevant person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events are referred to relevant person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Corrective action associated with unplanned pipeline construction operations is dealt with in accordance with work instructions and workplace procedures in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks and data collection relating to the quality of the work are undertaken in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete gastransmission pipeline construction operations

  1. Gas pipeline construction operations are monitored to ensure integrity of the pipe and the coating is maintained
Gas pipeline construction operations are monitored to ensure integrity of the pipe and the coating is maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance with work schedule is maintained and anomalies are reported to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and incidents are actioned and reported to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and waste materials are removed, cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, report forms and data sheets are completed accurately in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

gas pipeline operations must include the following:

backfill

clear and grade

ditching

hydro testing

joint coating

lower and lay

mechanical (minor maintenance)

string and bend

welding

plant and equipment must include the following:

backfill:

padding machine

excavator

grader

dozer

front end loader

mitsu bucket

clear and grade:

dozer

excavator

grader

backhoe

front end loader

ditching:

excavator

rock saw

bucket wheel trencher

general digging conditions

hard digging conditions

hydro testing:

crane truck

side boom

rough terrain crane

pumps

dead weight tester

temperature probes and sensors

headers

drying plant

after cooler

pig

chart recorder

lighting towers

gauging plate

joint coating:

grit blasting rig (skid steer)

wrapping machine

thermal coil

temperature probes and sensors

lower and lay:

side boom with roller cradles

excavator

mechanical (minor maintenance):

excavator and vacuum lift

bending machine and mandrels

internal line up clamp

tack rig

side boom

roller cradles

rock saw

bucket wheel trencher

thermal coil

over ditch wrapping machine

padding machines

mitsu bucket

string and bend:

excavator

bending machine with mandrels

side boom

pipe truck

vacuum lift

welding:

side boom

internal line up clamp

tack rig

temperature probes and sensors

headers