NTISthis.com

Evidence Guide: UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG333 - Work in proximity of transmission pipeline construction plant and equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to work in proximity of plant and equipment for transmission pipeline construction

  1. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures for the site are obtained and discussed with relevant person/s to confirm the work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures are obtained and applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Easement is inspected and assessed to determine relevant requirements in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of responsibility under the relevant work permit and/or relevant notification is obtained and confirmed with relevant person/s in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, plant, tools and personal protective equipment (PPE) required for the work are identified, scheduled, obtained and checked for operation and safety in accordance with workplace procedures and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are consulted to ensure the work is coordinated effectively with others involved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, plans, diagrams, drawings and resources required for the work are confirmed, scheduled and obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Responsibilities for first aid, emergencies and work safety procedures for an incident at the worksite are checked and confirmed with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Third-party issues are referred to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site preparation, safety plan and work schedule are confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work in proximity of plant and equipment for transmission pipeline construction

  1. WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with WHS/OHS workplace procedures and job instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is carried out to the required standard, without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risks and incidents are reported to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events are referred to the authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remedial action required when constructing pipeline easements is dealt with in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks are carried out in accordance with work instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work and relevant documentation

  1. WHS/OHS risk control measures for work completion are followed
WHS/OHS risk control measures for work completion are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is tidied and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

backfilling must include at least one (1) of the following items of plant and equipment:

padding machine

excavator

grader

dozer

front end loader

clearing and grading must include at least one (l) of the following items of plant and equipment:

dozer

excavator

grader

backhoe

front end loader

ditching must include at least one (1) of the following items of plant and equipment:

excavator

rock saw

bucket wheel trencher

hydro-testing must include at least one (1) of the following items of plant and equipment:

crane truck

side boom

rough terrain crane

joint coating must include at least one (1) of the following items of plant and equipment:

sand blasting rig (skid steer)

over ditch wrapping machine

thermal coil

lowering and laying must include at least one (1) of the following items of plant and equipment:

side boom with roller cradles

excavator

performing mechanical (minor maintenance) must include at least four (4) of the following items of plant and equipment:

excavator and vacuum lift

bending machine and mandrels

internal line up clamp

tack rig

side boom

roller cradles

rock saw

bucket wheel trencher

thermal coil

over ditch wrapping machine

padding machines

mitsu bucket

stringing and bending must include at least one (1) of the following items of plant and equipment:

excavator

bending machine with mandrels

side boom