Evidence Guide: UEGNSG346 - Launch and recover PIGs in gas transmission pipelines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG346 - Launch and recover PIGs in gas transmission pipelines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare and plan for pigging gas transmission pipelines

  1. Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work schedule, drawings, plans, job requirements and workplace procedures for the work are obtained and communicated to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures are obtained, applied and communicated to relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with others in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks are assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Responsibilities under the relevant work permit/notification are obtained and confirmed with relevant person/s to access, isolate/de-energise systems and perform the work in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Responsibilities for first aid and other emergency incidents at the work site are checked and confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication issues with relevant stakeholders are resolved and work coordinated in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site preparation, safety plan and work schedule are confirmed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site, PIG, PIG trap, station and pipeline are prepared to minimise risk and damage to property, commerce and individuals in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the work, including plant operators and contractors, are briefed and responsibilities confirmed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Launch and recover gastransmission pipeline PIGs

  1. WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures, schedule of work and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials, tools, equipment and measuring devices required for the work are selected and used correctly and safely in accordance with manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are performed safely in accordance with workplace procedures, codes and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Gas transmission pipeline PIG is launched, tracked and recovered in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is carried out to industry standards without waste of materials or damage to apparatus, circuits, and the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards and WHS/OHS risks are assessed and incidents reported to the authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Data/results from transmission pipeline pigging operations is gathered/retrieved and analysed to determine internal pipeline conditions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing and inspecting of the pipeline and pigging equipment is conducted in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events and non-routine problems are referred to authorised person/s for direction in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault-finding and troubleshooting techniques are applied to problems encountered with the PIG launch and recovery in accordance with requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of the work are undertaken in accordance with industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Re-establish transmission pipeline to operational condition, complete work and relevant documentation

  1. WHS/OHS risk control measures and workplace procedures for completing the work are followed
WHS/OHS risk control measures and workplace procedures for completing the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Retrieved PIG is inspected to determine the wear sustained to the PIG material and anomalies reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and injuries are reported in accordance with requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste materials are safely disposed of and work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate person/s are notified of work completion in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off and pipeline returned to service in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Data is recorded and work completion records, reports, as modified drawings and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

pigging gas transmission pipelines must be demonstrated on at least three (3) of the following procedures:

cleaning PIGs

gauging PIGs

drying PIGs

intelligent PIGs

PIG travel time calculations