NTISthis.com

Evidence Guide: UEGNSG411 - Maintain cathodic protection systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG411 - Maintain cathodic protection systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare and plan to maintain cathodic protection systems

  1. Work schedule/s, job requirements, drawings, plans and maps are identified and examined to identify the system maintenance work in accordance with workplace procedures
Work schedule/s, job requirements, drawings, plans and maps are identified and examined to identify the system maintenance work in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Readings from cathodic protection monitoring equipment and anode beds are taken at regular intervals and data collected in accordance with workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work schedules and job requirements for the maintenance are identified for all work sites and communicated to all relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work health and safety (WHS)/occupational health and safety (OHS) workplace procedures, and environmental and sustainable energy policies and procedures are obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures for identified hazards are prioritised, implemented and monitored against the work schedule in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access and perform work in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s at work site are suitably trained and qualified for the work to be performed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication issues with relevant stakeholders are resolved, as required, and work coordinated in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Third-party issues are referred to appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and adjust cathodic protection system equipment

  1. WHS/OHS, risk control measures and environmental policies and procedures are followed in accordance with workplace procedures
WHS/OHS, risk control measures and environmental policies and procedures are followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cathodic protection system is inspected, adjusted and maintained correctly and safely in accordance with job requirements, workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events and non-routine problems are identified and actioned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault-finding and troubleshooting techniques are applied to identify any repairs or maintenance required in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Data is collected and analysed and quality checks of the work undertaken in accordance with workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Re-establish system and complete relevant documentation

  1. Cathodic protection system is re-established, work undertaken is checked against work schedule for conformance and anomalies, and proposed solutions reported to relevant person/s in accordance with workplace procedures
Cathodic protection system is re-established, work undertaken is checked against work schedule for conformance and anomalies, and proposed solutions reported to relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents, injuries and non-conformances are reported, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off and system is returned to service in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, reports, documentation and as installed/modified drawings are completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

types of faults must include at least eight (8) of the following:

coating damage/deterioration

interference from other systems

anode not working

equipment fault/failure

earth faults

transformer failure

anode bed deterioration

anode cable failure

telluric effects on cathodic protection systems

isolated/insulation joint (IJ) failure and testing

flange insulation kit (FIK) failure and testing

checks and tests on cathodic protection systems must include at least four (4) of the following:

cathodic protection potential surveys

on/off potential surveys

coating defect assessment surveys (direct current voltage gradient (DCVG) method, Pearson technique/method, over pipeline potential method)

loop impedance testing

anode bed testing

soil resistivity testing

interference testing

trad unit commissioning and testing