The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG412 - Install cathodic protection systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan installation of cathodic protection system

  1. Work schedule/s, job requirements, drawings, plans and maps are identified and examined to identify the cathodic protection system installation in accordance with workplace procedures
Work schedule/s, job requirements, drawings, plans and maps are identified and examined to identify the cathodic protection system installation in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures for the work are identified for all work sites and communicated to all relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental and sustainable energy policies and procedures are obtained, applied and communicated to relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Data from completed cathodic protection surveys is analysed and work prioritised and sequenced for completion within acceptable timeframes following consultation with relevant person/s in accordance with workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures for identified hazards are prioritised, implemented and monitored against the work schedule in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are obtained to access and perform the installation work, in accordance with job requirements, workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical specifications and drawings are prepared from the analysed cathodic protection survey data and approved in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and checked for correct operation and safety in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication is established with relevant stakeholders to carry out the installation work in accordance with work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Third-party issues are referred to appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Person/s participating in the work are briefed and responsibilities coordinated and confirmed in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with job requirements, workplace procedures and traffic management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install cathodic protection system

  1. WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures
WHS/OHS risk control measures and environmental policies and procedures are followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are conducted safely in accordance with workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved specifications and drawings are reviewed and the cathodic protection system installed in accordance with the work schedule, workplace procedures and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised, hazards and WHS/OHS risks assessed and reported to authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events and non-routine problems in the installation are identified and actioned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault-finding and troubleshooting techniques are applied to identify any problems with the installation in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of the work are conducted in accordance with job requirements, industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test and commission cathodicprotectionsystem and complete relevant documentation

  1. Installed cathodic protection system and components are commissioned and tested for conformance and anomalies reported in accordance with regulatory requirements and workplace procedures
Installed cathodic protection system and components are commissioned and tested for conformance and anomalies reported in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents, injuries and non-conformances are reported, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off and equipment is returned to service in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cathodic protection system is tested and adjusted, additional survey data collected, and work completion records and documentation completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

As built/as installed drawings are checked, updated and returned to the relevant cathodic protection engineering person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

types of components and systems must include at least five (5) of the following:

solar powered supply systems

240 Volt power supply systems

insulation, flange insulation kit (FIK’s) and monolithic joints

sacrificial and impressed current anode beds

battery banks — acid and lead acid battery maintenance including sg measurement

transformer rectifiers and central processing units (CPUs)

lighting protection equipment

cathodic protection test points

installation of insulated joint protectors and testing

checks and tests on cathodic protection systems must include at least four (4) of the following:

potential surveys

trad unit commissioning and testing

interference testing

on/off potential surveys

coating defect assessment surveys (direct current voltage gradient (DCVG) method, Pearson technique/method, over pipeline potential method)

loop impedance testing

anode bed testing

soil resistivity testing

interference testing