NTISthis.com

Evidence Guide: UEGNSG619 - Perform scheduled maintenance on gas processing or storage facilities and equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEGNSG619 - Perform scheduled maintenance on gas processing or storage facilities and equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for maintenance and repair activities

  1. Appropriate facilities, tools, testing and measuring instruments, drawings, plans, materials and components for the work are selected in accordance with the work schedule/s and workplace procedures
Appropriate facilities, tools, testing and measuring instruments, drawings, plans, materials and components for the work are selected in accordance with the work schedule/s and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures for the work are obtained for all work sites/facilities and communicated to relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS, environmental and sustainable energy policies and procedures related to performing minor maintenance on LPG processing and storage facilities and equipment are obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with others in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards and WHS/OHS risks are identified and prioritised and control measures implemented and monitored against the work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access and perform the work and facilities and equipment is isolated, depressurised, purged, tagged and locked out before repair/maintenance work is undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled, obtained and confirmed in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Responsibilities for first aid and other emergency incidents at the work site are confirmed with relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication with authorised person/s, authorities, clients and land owners is conducted, as required, and work coordinated in accordance with the work schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared to minimise risk and damage to property, commerce and individuals in accordance with the work schedule and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Persons participating in the work, including plant operators and contractors, are briefed and responsibilities confirmed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fault-finding and troubleshooting techniques are applied to operational systems to identify any repairs or maintenance required in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned in accordance with job requirements and traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform scheduled maintenance and repairs

  1. WHS/OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents and hazards
WHS/OHS policies and procedures and safe work practices are followed to eliminate or minimise incidents and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous activities are performed safely and currency maintained, as required, in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance and repairs on LPG processing/storage facilities and equipment are coordinated to ensure completion in agreed timeframe, to industry standards and with a minimum of waste in accordance with job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments to calibration and test equipment/devices are made in accordance with manufacturer instructions to ensure equipment/devices operate within specific ranges and to maintain correct flow parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised and WHS/OHS risks assessed and reported to the authorised person/s for directions in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned events encountered when performing maintenance on LPG processing/storage facilities and equipment are identified and actioned in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance is performed and parts repaired or replaced by applying problem-solving techniques in accordance with workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality and safety checks of the maintenance work are conducted in accordance with job instructions, industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete scheduled maintenance and relevant documentation

  1. Maintenance results are documented and work undertaken is checked against work schedule/s for conformance and anomalies reported in accordance with workplace procedures
Maintenance results are documented and work undertaken is checked against work schedule/s for conformance and anomalies reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and injuries are reported in accordance with requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and made safe in accordance with job instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit/s are signed off and equipment is returned to service in accordance with job and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work completion records, reports and documentation are completed, processed and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEG Gas Industry Training Package Companion Volume Implementation Guide.

equipment must include at least seven (7) of the following:

pressure vessel

vapourisers

earth connections

relief valves

system(s) isolation

emergency shutdown valving, including – idle speed control (ISC) valves

manual shutdown valving

pipe work

vessel footings

regulators

hoses and couplings

pumps

compressors

identifying irregularities must include at least three (3) of the following:

incorrect flow rates

corrosion

impact damage

point deterioration

leakage

non-operability of shutdown systems

equipment out of calibration

scheduled maintenance, repairs and replacement of parts must include at least six (6) of the following:

excess flow valves

relief valves

pressure regulators/springs

pump seals/compressor seals

pressure gauges

bypass valves

meters

solenoids

valves

break away couplings

meter heads

transfer hoses