The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Safety issues are identified to comply with enterprise/site requirements Completed |
Evidence:
|
Machine requirements/work identified and verified from job specifications Completed |
Evidence:
|
Quality assurance requirements recognised and adhered to Completed |
Evidence:
|
Locations of services identified from plans and drawings Completed |
Evidence:
|
Features identified from site drawings Completed |
Evidence:
|
Services are located on site, verified and marked Completed |
Evidence:
|
Work schedules are developed in accordance with job requirements Completed |
Evidence:
|
Pre-operational checks are carried out on plant in accordance with manufacturer's recommendations and site requirements Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of on-the-job training Completed |
Evidence:
|
Operate machine
|
|
Start up, park up and shut down procedures carried out in accordance with manufacturer's and/or site specific requirements Completed |
Evidence:
|
Method of operating machine adjusted to accommodate various weather and ground conditions Completed |
Evidence:
|
Safe grip and productivity maintained in varied conditions Completed |
Evidence:
|
Machine is operated in accordance with manufacturer's and/or site requirements to produce smooth movement of attachments Completed |
Evidence:
|
Machine is monitored to detect deviations from required operating conditions and faults acted upon or reported in accordance with site instructions/requirements Completed |
Evidence:
|
Emergency procedures are carried out in accordance with manufacturer's and/or site requirements Completed |
Evidence:
|
Abnormal operating conditions of the machine are identified and reported in accordance with requirements Completed |
Evidence:
|
Load is shifted and/or transferred in accordance with site requirements Completed |
Evidence:
|
Most appropriate load shifting device selected Completed |
Evidence:
|
Accessories are used to shift and transfer material in accordance with manufacturer's manual and job specifications Completed |
Evidence:
|
Complete documentation
|
|
Post operational checks and minor maintenance are carried out on machine and/or accessories in accordance with manufacturer's recommendations and site requirements Completed |
Evidence:
|
Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures Completed |
Evidence:
|