The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for switching operations
|
|
Safety issues are identified to comply with enterprise/site and legislative requirements Completed |
Evidence:
|
Work requirements are identified from relevant personnel and documentation Completed |
Evidence:
|
Documentation to determine plant status is assessed and evaluate Completed |
Evidence:
|
Localised plant/equipment inspection, pre- operational checks and field preparation for service are carried out in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Switchboard/equipment operational pre-requisites and switching sequences are established in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training Completed |
Evidence:
|
Carry out operation of switchgear, switchboards and rectification systems
|
|
Operation of switchgear is carried out in accordance with manufacturer’s and enterprise/site procedures and programmes Completed |
Evidence:
|
Isolation, removal and reinstatement of switchgear/switchboards/rectification systems is carried out in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Paralleling/balancing requirements are assessed and met to ensure system stability Completed |
Evidence:
|
Rectification system is operated, isolated and reinstated in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Test switchgear and rectification equipment operation
|
|
Tests are performed in accordance with defined procedures applicable to the operational test Completed |
Evidence:
|
Switchgear and/or rectification equipment is observed for correct operational response Completed |
Evidence:
|
Corrective action is taken when response is not in accordance with documentation, system integrity or personnel safety requirements Completed |
Evidence:
|
Switchgear and/or rectification equipment is returned to required operational status upon completion of test Completed |
Evidence:
|
Analyse system, switchgear and rectification equipment faults
|
|
Causes of abnormal system/switchgear operating conditions are identified by analysing the technical and operational information in a logical and sequential manner Completed |
Evidence:
|
Corrective action taken is in accordance with enterprise/site procedures Completed |
Evidence:
|
System/switchgear/plant integrity and personnel safety are maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation Completed |
Evidence:
|
Inspect and monitor system and switchboards
|
|
System/switchgear to be monitored/ inspected is physically identified Completed |
Evidence:
|
System/switchgear is monitored /inspected for normal operation or to detect deviations Completed |
Evidence:
|
Corrective action taken is in accordance with enterprise/site procedures Completed |
Evidence:
|
Appropriate personnel are notified when defects and abnormal operating conditions are detected Completed |
Evidence:
|
Complete documentation
|
|
Documentation is updated and equipment problems, abnormalities and status are reported and logged in accordance with enterprise/site procedures Completed |
Evidence:
|