The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
Safety issues are identified to comply with enterprise/site requirements Completed |
Evidence:
|
Work requirements are identified from relevant personnel and documentation Completed |
Evidence:
|
Pre operational checks are carried out on plant according to manufacturer’s recommendations and site requirements Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training Completed |
Evidence:
|
Start and run up gas turbine
|
|
Pre-operational conditions are established in accordance with enterprise standards and site requirements Completed |
Evidence:
|
Where the gas turbine is a component of a combined cycle unit pre-operational conditions of the Heat Recovery Steam Generator, associated steam mains and Steam Turbine are established in accordance with enterprise standards and site requirements. Completed |
Evidence:
|
Starting procedures are commenced and correct purge, ignition and run-up sequence observed Completed |
Evidence:
|
Minimum operation of gas turbine is established and supported in accordance with enterprise, manufacturer’s and site requirements. Completed |
Evidence:
|
Where the gas turbine is a component of a combined cycle unit monitoring and control of Heat Recovery Steam Generator drum level, feedwater flow, steam and metal temperature rates of rise, steam pressure rate of rise, steam flow and drainage are carried out in accordance with manufacturer’s and site requirements Completed |
Evidence:
|
Gas Turbine exhaust gas temperature and flow to the Heat Recovery Steam Generator and Gas Turbine power output are monitored and adjusted to achieve required steam conditions and demand, observing operating requirements Completed |
Evidence:
|
Plant is operated within limits of plant design, enterprise or site requirements. Completed |
Evidence:
|
Plant is monitored and observed to detect deviations from required operating conditions. Completed |
Evidence:
|
Corrective action is taken to rectify abnormalities in accordance with manufacturer’s and enterprise/site procedures Completed |
Evidence:
|
Test plant operation
|
|
Tests are performed in accordance with defined procedures applicable to the operational test Completed |
Evidence:
|
System and plant is observed for correct operational response Completed |
Evidence:
|
Corrective action is taken when response is not in accordance with documentation, plant integrity or personnel safety requirements Completed |
Evidence:
|
Plant is returned to required operational status upon completion of test Completed |
Evidence:
|
Identify and respond to plant operation anomalies
|
|
Cause/s of abnormal plant operating conditions are identified by analysing the technical and operational information in a logical and sequential manner Completed |
Evidence:
|
Corrective action taken is in accordance with enterprise/site procedures Completed |
Evidence:
|
Plant integrity and personnel safety is maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation Completed |
Evidence:
|
Appropriate personnel are notified when defects are detected Completed |
Evidence:
|
Complete documentation
|
|
Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures Completed |
Evidence:
|