Evidence Guide: UEPOPS417B - Monitor and implement environmental plans and procedures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEPOPS417B - Monitor and implement environmental plans and procedures

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to Implement Environmental Plans and Procedures

  1. Environmental plans and procedures are identified and examined in accordance with the work site or project requirements.
  2. Environmental risks and impacts are identified for the specific project or work site.
  3. Environmental plans and procedures are selected in accordance with the specific project or work site requirements.
Environmental plans and procedures are identified and examined in accordance with the work site or project requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental risks and impacts are identified for the specific project or work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental plans and procedures are selected in accordance with the specific project or work site requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement Environmental Plans and Procedures

  1. Emergency procedures are implemented and environmental risks are controlled in accordance with project/site requirements
  2. Appropriate activities are carried out in accordance with the environmental plan and procedures.
  3. Environmental control procedures are implemented, established and maintained, and risks mitigated in accordance with the project/site requirements.
Emergency procedures are implemented and environmental risks are controlled in accordance with project/site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate activities are carried out in accordance with the environmental plan and procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental control procedures are implemented, established and maintained, and risks mitigated in accordance with the project/site requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop Site/Project Environmental Procedures

  1. Specific needs for project/site environmental procedures are identified and assessed taking into account affected stakeholders and appropriate relevant data.
  2. Specific project/site environmental procedures are developed and reviewed in accordance with appropriate relevant data.
Specific needs for project/site environmental procedures are identified and assessed taking into account affected stakeholders and appropriate relevant data.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specific project/site environmental procedures are developed and reviewed in accordance with appropriate relevant data.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage Environmental Incident

  1. Environmental incidents are identified and controlled in accordance with the appropriate plans and procedures.
  2. Environmental incidents are recorded and reported in accordance with the appropriate plans and procedures.
Environmental incidents are identified and controlled in accordance with the appropriate plans and procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental incidents are recorded and reported in accordance with the appropriate plans and procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and Report on the Applications of Environmental Plans and Procedures

  1. The application of environmental plans and procedures are monitored and documented.
  2. Environmental risks and incidents are reported in accordance with site/enterprise procedures.
  3. Participation by the relevant workforce in reviews of environmental procedures is ensured and reported.
The application of environmental plans and procedures are monitored and documented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental risks and incidents are reported in accordance with site/enterprise procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Participation by the relevant workforce in reviews of environmental procedures is ensured and reported.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this competency standard unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UEP12”. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement

Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement

Demonstrate an understanding of the essential knowledge and associated skills as described in 6) Essential Knowledge and Associated Skills of this unit

Demonstrate an appropriate level of employability skills

Conduct work observing the relevant Anti-Discrimination legislation, regulations, polices and workplace procedure

Demonstrated performance across a representative range of contexts from the prescribed items below:

Relating environmental plans and procedures to the project/site; identifying environmental risks and impacts; integrating operational activities into reviews of environmental procedures; developing project/site procedures; applying environmental plans and procedures to the project/site; monitoring application of environmental plans and procedures; managing environmental incidents at the project/site.

Dealing with an unplanned event by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.

Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.

Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.

In addition to the resources listed above in Context of assessment’, evidence should show competency working in limited spaces with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment

9.4)

This unit shall be assessed by methods given in Section 1.3.00 Assessment Guidelines.Note:

Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.

Nil

Required Skills and Knowledge

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired monitoring and implementing environmental plans and procedures.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

The extent of the Essential Knowledge and Associated Skills required follows:

KS01-PO417B Environmental plans and procedures

T1 Evidence shall show that knowledge has been acquired for safe working practices of:

Relevant legislative requirements; standard operating procedures; environmental plans and procedures

Plant drawings and manufacturers manuals

Introduction to and typical arrangements of power production plant

Relevant plant and equipment, its location and operating parameters

Enterprise procedures

Gaseous emission removal equipment, types and characteristics

Particulate removal equipment types and characteristics

Water pollution control equipment, types and characteristics

NOx control equipment, types and characteristics

Sedimentation and erosion control; risk assessment procedures

Rare and endangered plants; recording procedures

Cultural/heritage sites Identification

Reporting procedures

Monitoring procedures; identification of risks and impacts

Consultation procedures

Incident management procedures

Potential environmental risks and incidents

Disposal of dangerous and contaminated soils

Environmental auditing; concepts of due diligence

Principles of environmental protection

Endangered species and habitat protection

Environmental impact assessment

Control procedures for environmental risks and incidents

Waste management.

T2 Specific skills needed to achieve the Performance Criteria:

Interpret plant drawings and manufacturers manuals

Apply control procedures at environmental risks and incidents

Access, interpret and apply relevant legislation and standard operating procedures

Assess environmental risks at the specific project/site

Apply environmental plans and procedures

Develop local workplace environmental procedures

Identify risks and impacts

Apply consultation processes

Manage environmental incidents

Conduct environmental audits

Monitor specific project/site

Identify possible cultural/heritage sites

Identify potential pollutants

Solve operational problems.

Range Statement

10) This relates to the competency standard unit as a whole, providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

Environmental impact is any change to the environment whether adverse or beneficial, wholly or partially resulting from an enterprise’s activities, products or services.

Specific project/site may include hydro storage dams, canals, rivers, spillways, drainage sites, workshops, waste disposal sites, power stations, maintenance sites.

Issues, which broad environmental plans and procedures may address, include, but are not restricted to:

National, State or local government; local government/regional development plans; water resources; industry/cross industry; business/enterprise cultural, heritage; conservation/flora/fauna; waste disposal; coastal protection; ground water protection; irrigation; salination control; pollution/litter control; river/surface water systems; chemical management; biological control, i.e. blue green algae; corporate or enterprise.

Environmental risks may include:

impact of mismanagement of chemicals; impact of mismanagement of biological agents; detrimental impact on limited water resources; spillage; waste disposal; detrimental impact on water catchment areas (urban and non-urban); detrimental impact on rivers, waterways and channels; unsatisfactory water and waste water treatment processes; unsatisfactory trade waste treatment and disposal processes; poor construction processes; planning deficiencies.

Environmental legislation may include:

Relevant federal by-laws; relevant State/Territory legislation; relevant local government by-laws; relevant government or quasi government policies and regulations.

Incidents of environmental impact may include:

emissions to air; releases to/of water; releases to land; vibration and noise; disposal of waste; contamination of land; impact on communities; destruction of habitat; use of energy sources; waste generation processes and technologies; impact on culturally significant sites; and may involve the implementation of emergency responses.

Environmental management documentation may include:

information on applicable environmental laws or other requirements; compliant records; training records; process information; process operational log books,; inspection, maintenance and calibration records; relevant contractor and supplier information; incident reports; information on emergency preparedness and response; records of significant environmental impacts; chain of custody and compliance records; audit results; management reviews.

Stakeholders may include:

the enterprise; government (all levels); industry – extractive, other utilities, manufacturing, etc.; community action groups; environmental conservation groups; land care groups; primary producers; the general community and individuals; ATSI groups.

Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.