The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare steam turbine shut down work
|
|
Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, industry standards and workplace procedures Completed |
Evidence:
|
Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Turbine shut down schedule is identified from relevant documentation, in accordance with workplace procedures and site requirements |
|
Completed |
Evidence:
|
Pre-shut down checks are carried out on steam turbine plant, in accordance with manufacturers' recommendations and workplace procedures |
|
Completed |
Evidence:
|
Conduct steam turbine shutdown
|
|
Steam turbine load is reduced, in accordance with and manufacturers' recommendations and workplace procedures Completed |
Evidence:
|
Steam turbine and generator are removed from the steam generation system, in accordance with manufacturers' recommendations and workplace procedures |
|
Completed |
Evidence:
|
Steam turbine is placed on turning gear, in accordance with manufacturers' recommendations and workplace procedures |
|
Completed |
Evidence:
|
Steam turbine is cooled down on turning gear, in accordance with manufacturers recommendations and workplace procedures |
|
Completed |
Evidence:
|
Test steam turbine plant operation during shut down
|
|
Tests are performed, in accordance with workplace procedures Completed |
Evidence:
|
Steam generation system and steam turbine plant is observed, in accordance with workplace procedures, for correct operational response |
|
Completed |
Evidence:
|
Corrective action is taken, in accordance with workplace procedures, when response does not meet documentation, plant integrity or personnel safety requirements |
|
Completed |
Evidence:
|
Steam turbine plant is returned to operational status upon completion of testing, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Analyse and report on system faultsorstatus during steam turbine shutdown
|
|
Causes of abnormal steam turbine plant operating conditions are identified, in accordance with workplace procedures, by analysing technical and operational information Completed |
Evidence:
|
Corrective action is taken, in accordance with workplace procedures |
|
Completed |
Evidence:
|
Steam turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation |
|
Completed |
Evidence:
|
Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected |
|
Completed |
Evidence:
|
Complete documentation
|
|
Steam turbine plant problems, movements and status are reported, in accordance with workplace procedures Completed |
Evidence:
|
Documentation is updated, in accordance with workplace procedures |
|
Completed |
Evidence:
|