The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Interpret requirements
|
|
Notification of requirement is confirmed and assessed Completed |
Evidence:
|
Area of planned outage is identified using system diagrams, drawings and/or maps, in consultation with appropriate personnel Completed |
Evidence:
|
Planned work details are interpreted from outage request or equivalent and stated on the draft program Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training Completed |
Evidence:
|
Research switching programme
|
|
Implications of switching program on the system are identified and recognised Completed |
Evidence:
|
Types and function of switchgear to be operated are identified and their suitability for operation under forecast system conditions during scheduled outage is assessed Completed |
Evidence:
|
System loadings, limitations and alternate supply route capabilities are evaluated to ensure system integrity Completed |
Evidence:
|
Consultation with appropriate parties affected by the switching programme is undertaken in accordance with enterprise procedures Completed |
Evidence:
|
Consideration is given to geographical and/or site location of isolation points to conclude shortest possible route when determining sequence of switching steps in order to minimise outage time Completed |
Evidence:
|
Isolated work area is appraised to ensure safe working clearances are maintained in accordance with mandatory regulations and enterprise/site requirements Completed |
Evidence:
|
H.V./L.V. and control circuitry is examined to ensure no back-feed to work is possible Completed |
Evidence:
|
Draft switching program
|
|
Draft is formatted in logical sequential steps, stating location, apparatus, apparatus ID and operation to be conducted Completed |
Evidence:
|
Permit to work procedures are entered at correct step in program Completed |
Evidence:
|
Program is planned to ensure access, work and reinstatement take place in a logical and sequential manner Completed |
Evidence:
|
Switching program is checked for errors and omissions in accordance with enterprise procedures Completed |
Evidence:
|
All documentation supporting the program is filled out requirements in accordance with enterprise procedures Completed |
Evidence:
|
Validate program
|
|
Switching program is forwarded to appropriate personnel for checking and verification in accordance with enterprise procedures Completed |
Evidence:
|