The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare network operations
|
|
Information and documentation to determine network/system status is assessed and evaluated in accordance with system requirements Completed |
Evidence:
|
Network/system and associated equipment operational pre-requisites are established in accordance with enterprise/system procedures Completed |
Evidence:
|
Sequence for recommissioning of network sections and equipment is identified and determined to suit existing circumstances in accordance with enterprise/system procedures Completed |
Evidence:
|
Forecast prediction is based on the accurate interpretation and analysis of relevant information in accordance with system procedures Completed |
Evidence:
|
Network/system limitations and performance due to location and external influences are identified Completed |
Evidence:
|
Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training Completed |
Evidence:
|
Manage and control network /system
|
|
Network/system is operated in accordance with enterprise/system operating procedures Completed |
Evidence:
|
Network/system demand is met with contingencies in place to maintain quality of supply standards in accordance with statutory requirements Completed |
Evidence:
|
Network/system voltage and current requirements are assessed, evaluated and controlled to maintain stability and system integrity Completed |
Evidence:
|
Voltage/load profiles are identified and adhered to minimising transmission losses Completed |
Evidence:
|
Network/system load shedding sequence and priorities are monitored to ensure system integrity Completed |
Evidence:
|
Network/system data is monitored for normal operation or to detect deviations Completed |
Evidence:
|
Corrective actions to rectify abnormalities are implemented following analysis of data in accordance with system procedures Completed |
Evidence:
|
Resources required to meet system requirements are identified and coordinated in accordance with system procedures Completed |
Evidence:
|
Where required, operations are carried out in consultation with team members Completed |
Evidence:
|
Analyse and respond to network/ system faults or incidents
|
|
Causes of abnormal network/system operating conditions are identified by analysing the technical and operational information in a logistical and sequential manner Completed |
Evidence:
|
Operation of protection systems are identified and assessed to evaluate the nature and cause of fault conditions. Completed |
Evidence:
|
Communication may be established with other authorities and/or key stake holders to identify nature/source of system interference Completed |
Evidence:
|
Corrective action is taken in accordance with enterprise/system procedures Completed |
Evidence:
|
Network/system integrity and personnel safety are maintained through consultation with appropriate personnel and reference to plant technical, operational documentation and contingency plans Completed |
Evidence:
|
Review incident response and preventative procedures
|
|
Incident responses are assessed and reviewed in accordance with system procedures Completed |
Evidence:
|
Alternative responses/contingencies are identified and assessed in accordance with system procedures Completed |
Evidence:
|
Alternative responses/contingencies are documented and approved in accordance with system procedures Completed |
Evidence:
|
Complete documentation
|
|
Documentation is updated, log sheets maintained and equipment/system problems, movements abnormalities and status are reported and logged in accordance with enterprise/site procedures Completed |
Evidence:
|