Evidence Guide: UETTDRRT99 - Test and verify rail traction installations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETTDRRT99 - Test and verify rail traction installations

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to inspect, test and verify rail traction installations

  1. Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed
Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and workplace procedures are identified and communicated with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for accessing, testing and verification of rail traction installations are obtained and confirmed for the purposes of the work to be performed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are obtained to access rail corridor, understood and signed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specialist test and measurement equipment for testing and verification of rail traction installations are obtained, inspected, calibrated and confirmed in working order in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with track protection officer and/or network control officer and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Traffic management plan is confirmed as being applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out visual inspection, test and verification of Rail Traction installation

  1. WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing and verification of rail traction installations are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail traction installations and associated hardware are visually inspected and confirmed as positioned, secured and terminated/connected in accordance with job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Energised tests and/or measurements, as required, to verify rail traction installations are determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail traction installations are checked for suitability and compliance with organisational construction standards and relevant electrical rail traction network supply standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail traction installation protection methods and devices are validated as meeting organisational construction and relevant rail traction network protection standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail traction installation switchgear is appropriately rated and validated, meeting functional requirements of organisational construction and relevant distribution network protection standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail traction installations earthing system and multiple earth neutral (MEN) system components are installed and compliance verified in accordance with workplace construction procedures and distribution network standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mandatory tests are conducted to verify rail traction installation is in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Solutions used to solve problems are applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of work are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report inspection and test findings

  1. WHS/OHS risk control work completion measures and procedures are followed
WHS/OHS risk control work completion measures and procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-compliance defects are identified, corrected and/or reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recommendations for rectifying defects are made in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mandatory documentation is completed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are signed off and electrical equipment (network infrastructure) returned to service in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work records, reports and/or documentation are completed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge
Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.