Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETTDRSO36A - Develop low voltage distribution switching programs

What evidence can you provide to prove your understanding of each of the following citeria?

Plan for the preparation of LV Distribution switching programs

  1. OHS practices/procedures and environmental and sustainable energy procedures, which may influence the preparation of LV Distribution switching systems, are reviewed and determined.
  2. Purpose of the switching program preparation is established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel.
  3. Organisational established procedures on policies and specifications for the LV Distribution Switching systems are obtained or established with the appropriate personnel.
  4. Testing procedures are discussed with/directed to the appropriate personnel in order to ascertain the project brief.
  5. Testing parameters are established from organisational established procedures on policies and specifications.
  6. Equipment/tools and personal protective equipment are selected based on specified Performance Criteria and established procedures.
  7. Work roles and tasks are allocated according to requirements and individuals’ competencies.
  8. Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures.
  9. Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.
  10. Risk control measures are identified, prioritised and evaluated against the work schedule.
  11. Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.
OHS practices/procedures and environmental and sustainable energy procedures, which may influence the preparation of LV Distribution switching systems, are reviewed and determined.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Purpose of the switching program preparation is established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organisational established procedures on policies and specifications for the LV Distribution Switching systems are obtained or established with the appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing procedures are discussed with/directed to the appropriate personnel in order to ascertain the project brief.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing parameters are established from organisational established procedures on policies and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment/tools and personal protective equipment are selected based on specified Performance Criteria and established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work roles and tasks are allocated according to requirements and individuals’ competencies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk control measures are identified, prioritised and evaluated against the work schedule.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out the preparation of LV Distribution switching programs

  1. Circuit/systems modelling is used to evaluate alternative proposals as per established procedures.
  2. OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures.
  3. LV Distribution switching program decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures.
  4. Mathematical and/or engineering models of the LV Switching systems are used to analyse the effectiveness of the finished project as per requirements and established procedures.
  5. Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures.
  6. Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements.
  7. Testing of LV switching program is undertaken according to requirements and established procedures.
  8. Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures.
  9. Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements.
  10. Quality of work is monitored against personal performance agreement and/or established organisational and professional standards.
  11. Strategic plans are developed incorporating organisation initiatives as per established procedures.
Circuit/systems modelling is used to evaluate alternative proposals as per established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

LV Distribution switching program decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mathematical and/or engineering models of the LV Switching systems are used to analyse the effectiveness of the finished project as per requirements and established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing of LV switching program is undertaken according to requirements and established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality of work is monitored against personal performance agreement and/or established organisational and professional standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strategic plans are developed incorporating organisation initiatives as per established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the preparation of LV Distribution switching programs

  1. Final review of the switching program is undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the project.
  2. Appropriate personnel are notified of completion and reports and/or completion documents are finalised/commissioned.
  3. Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval.
  4. Approved copies of the preparation of LV Distribution Switching programs documents are issued and records are updated in accordance with established procedures.
Final review of the switching program is undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate personnel are notified of completion and reports and/or completion documents are finalised/commissioned.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved copies of the preparation of LV Distribution Switching programs documents are issued and records are updated in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the competency standard unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each Element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UET12”. Evidence shall also comprise:

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and

Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and

Demonstrate an understanding of the essential knowledge and associated skills described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and

Demonstrate an appropriate level of employability skills; and

Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Range of tools/equipment/materials/procedures/workplaces/other variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

Demonstrate at least three (3) switching programs that between them encompass at least 7 of the following:

A transformer with a LV winding and fixed tap

LV busbars

LV isolators

LHV switchgear (applicable to enterprise equipment)

Phasing and phase rotation

Commissioning an item of LV plant

A planned interruption to an LV customer/s

Installation of a mobile generators

B

Prepare switching instructions to isolate, test and earth all of the following

All enterprise transformer types with LV windings

All enterprise LV busbar types

All enterprise LV feeder types

All enterprise LV circuit breakers, isolators or switches

C

Prepare, write and check switching sheets to do all of the following:

Manage load

Manage voltage

Minimise losses

Maximise network reliability

D

Do all of the following:

Check all above types of switching instructions

Coordinate all above types of switching instructions

Calculation of plant loading

Application and administration of SCADA or enterprise specific system.

Analysis and diagnosis of system failure

E

At least one occasion

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual preparation of LV Distribution Switching programs.

Note:

Access will be needed to: relevant protection, control, metering, and alarm equipment, network drawings, computerised electrical plant control and monitoring facilities, operational event data, enterprise operational policies, procedures and work practices and enterprise crisis management procedures

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.

Method of assessment

9.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 “Assessment Guidelines”.

Note:

Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

For optimisation of training and assessment effort, competence in this unit may be assessed concurrently with units:

UETTDRSO37A

Develop high voltage distribution and subtransmission switching programs

UETTDRSO38A

Develop and evaluate power systems transmission switching programs

Required Skills and Knowledge

8) Essential Knowledge and Associated Skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of developing LV distribution switching programs.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-TSO36A Low voltage distribution switching programs

Evidence shall show an understanding of low voltage distribution switching programs to an extent indicated by the following aspects:

T1 Transmission, distribution and rail systems encompassing:

Relationship between the transmission, distribution and rail/tram system within an overall power system - different organisations responsible for generation, transmission, distribution and rail/tram and, how they correlate and their functions

Characteristics of a transmission, a distribution and a rail system - principal components, typical voltage levels and methods of transmission and distribution including grid type transmission systems, radial, parallel and ring main feeders

Relationship between an overhead and underground supply systems within an overall power system - advantages/disadvantages, applications and the basic steps for planning and installing an overhead and underground distribution system

Single line drawings and layouts - drawings and layouts of transmission and distribution systems including, radial, parallel and ring main feeders and the HV equipment associated with substations.

T2 Control of generator systems for synchronisation of a LV genset encompassing:

Standards, codes, legislation, supply authority regulations and or enterprise requirements pertaining to the operation of a portable generator encompassing:

Safety precautions specific to the synchronisation of gensets - safe working practices and procedures, synchronising procedures

Techniques in the installation of gensets control systems - the synchronising of generator control systems onto and off the network without interruption to supply, estimation of LV load, assessing the appropriateness of the generator.

Operating a generator in parallel to a single LV job - overhead systems, indoor systems, customer installations, kiosk substations

LV genset and control system to LV Distribution assets.

T3 Different types and function of distribution components encompassing:

Commonwealth/State/Territory and local government legislation, Standards, codes, Commonwealth, State/Territory and local government legislation, supply authority regulations and or enterprise requirements applicable to the use and application of distribution components

Requirements for the use of overhead line construction manuals, system diagrams/plans and drawings

Types, function and characteristics of distribution components

Safety policies and procedures precautions related to the handling and installing distribution components

T4 Co-ordinating access authority procedures encompassing:

Specific enterprise processes, policies and procedures to be followed

Processes of consultation, negotiation and co-ordination - clear and concise instructions and information, methods for the encouragement of feedback and contributions of information and ideas, responsibilities of members of the team.

Techniques in analysing, planning, co-ordination and organising work for a safe outcome and according to statutory requirements and regulations

Techniques in the effective utilisation of available resources

Techniques in the development of an access authority/permit and/or access authority/permit issuing procedures

Techniques in facilitating and co-ordinating the delivery and issuing of access authorities

Techniques in gathering, collating and confirming data on different worksites - electrical network diagrams for the specific work site, earth access authorities, safe working area, work to be carried out in confined space or in hazardous environment, specific outsourcing procedures, specific hazard identification, risk classification and management procedures, regulatory requirements such as Occupational Health and Safety and electrical safety

Techniques in the receiving and co-ordinating the cancellation of access authorities in readiness for restoration

Methods of conducting audits on correct access authority procedures

Process of issuing of other access authorities for work permits - working in confined space, if required, co-ordination of access authorities, engaging and briefing contractors on electrical and other work

Issue and receipt of operating agreements.

T5 Principles of Statutory and safety considerations encompassing:

Commonwealth/State/Territory legislation, standards, codes, supply authority regulations and or enterprise requirements associated with working on High Voltage

Particular reference to State and Territory regulations regarding - working near energised conductors, electrical access, heights, confined space, testing procedures, licensing rules.

T6 Principles of isolation and tagging procedures associated with protection testing encompassing:

Standards, codes, Commonwealth/State/Territory legislation, supply authority regulations and or enterprise requirements associated with the installation, maintenance, isolation and tagging procedures

Requirements for the use of, isolation and tagging, manuals, system diagrams/plans and drawings

Techniques in documenting isolations

Techniques in appropriate isolation and tagging procedures as per Commonwealth /State /Territory legislation, supply authority regulations and enterprise standards

Techniques in the installation and maintenance procedures protection devices as per Commonwealth/State/Territory legislation, supply authority regulations and enterprise standards.

T7 Low voltage switching principles encompassing:

Standards, codes, legislation, supply authority regulations and or enterprise requirements applicable to switching of low voltage to a given schedule

Requirements for the use of manuals, system diagrams/plans and drawings - types, characteristics and capabilities of electrical apparatus, use, characteristics and capabilities of specialised tools and testing equipment, LV network interconnectors source of possible backfeed

Low voltage switching techniques - identifying hazards, assessing and controlling risks associated with LV switching operations, electrical access permit(s), operational procedures, earthing procedures

Personnel protective equipment (PPE) for LV switching

T8 LV system switching principles including switching authorisation procedures encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements applicable to system switching

Requirements for the use of manuals, system diagrams/plans and drawings

Types and characteristics of LV systems and equipment to be switched

Procedures for obtaining correct LV switching authorization - identification of OHS hazards, assessing and controlling risks, safety procedures and precautions, safe approach distances, responsibilities and protocols, identifying switching resources, procedures for obtaining electrical access permits authorities, requirements for team switching, procedures for coordination of operations.

Techniques in LV system switching - isolation procedures and proving dead, earthing procedures, pre-switching checks, switching operational procedures, emergency fault procedures, energisation procedures.

T9 Low voltage overhead and substation switching principles encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements applicable to low voltage overhead and substation switching

Requirements for the use of manuals, system diagrams/plans and drawings - types, characteristics and capabilities of LV electrical equipment to be switched, use, characteristics and capabilities of specialised tools and testing equipment, role and responsibilities of the LV switching operator.

Operational forms, access authorities and hazard/risk assessments associated with HV switching - types of operational forms, access authorities and hazard/risk assessments, purpose and procedure for operational forms, access authorities and hazard/risk assessments.

Use and operation of equipment associated with LV overhead and substation equipment - test instruments, sticks, interrupters, arc stranglers.

LV switchgear – types, categories, application, operating capabilities

Operation of LV overhead switching or indicating devices - fuses; disconnect fuses; load switching; underslung links, air break switches; disconnects; live line clamps; phasing sticks; phasing tester.

Operation of protection systems and substation equipment - fault levels and settings; types and applications, protection systems and substation equipment fault levels and settings; types and applications.

Restrictions pertaining to LV switching equipment

Procedures for the isolation of LV distributions main and working earths

Earthing LV electrical apparatus practices and procedures for access authority issuing

Low voltage switching techniques

Operate switching apparatus - identifying hazards, assessing and controlling risks associated with LV switchgear operation, systematic and defensive techniques, mobile radio procedures, double isolation procedures.

T10 Preparation of a LV switching instruction encompassing:

Legislation, Standards, codes, legislation, supply authority regulations and or enterprise requirements applicable to switching sheet schedules

Requirements for the use of manuals, system diagrams/plans and drawings - types, characteristics and capabilities of LV electrical equipment to be switched, isolation points and earthing, responsibilities of the switching operator.

Techniques in writing switching schedules - sequence of switching operations, isolation procedures, earthing procedures, switching completion notification procedures.

T11 Enterprise specific — policy and procedure instructions encompassing:

Responsibilities and duty of care of employer and employee relationship

Methods of obtaining the up-to-date information on enterprise policy and procedures

Rules and regulations

Induction into workplace - location of work area and storage area, timetable, uniform, personal well-being, housekeeping rules, emergency procedures, evacuation procedures

Techniques when deal with others - working in teams, customer relation, complaint and issues procedures.

Overview of enterprise professional development - fire fighting procedures, fatigue management, training and competency development - understanding and promotion

T12 Enterprises specific — OHS instructions encompassing:

Standards, codes, legislation, supply authority regulations and specific enterprise regulations pertaining to the OHS policies and procedures

Methods of obtaining the up-to-date information on enterprise OHS policy and procedures

Specific enterprise personal protection equipment - type and application, where and when to be used, method of replacement, responsibility of maintenance including cleaning inspection and testing, emergency response, rescue, evacuation and First Aid procedures

Personal well-being – hygiene, fatigue/stress management, drugs/alcohol

OHS training - induction training, specific hazard training, specific task or equipment training, emergency and evacuation training, training as part of broader programs such as equipment operation

OHS records including audits, inspection reports, workplace health and environmental monitoring records, training and instruction records, manufacturers and suppliers information such as MSDSs, registers, maintenance reports, workers compensation and rehabilitation records and First Aid/medical records

T13 Enterprise specific switching diagrams and drawing encompassing:

Types and application of enterprise specific switching drawings and documents - wiring and schematic diagrams and switching symbols, mechanical drawings dealing with switching operations, project charts, switching schedules, graphs, technical manuals and catalogues, instruction/work sheets.

Interpretation of different system switching diagrams - LV system switching diagrams, DC traction supply sectioning diagrams, HV transmission and distribution system symbols and feeder plans, processes of updating switching diagrams

T14 LV system load calculation principles encompassing:

Structure of LV systems

Ratings of LV system components

Methods of determining load on LV systems

Records of load on LV systems

Effect of added load on LV mains - variation of current, voltage, and power factor

Load flow in parallel operation

Enterprise specific network coordination tools

Range Statement

10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to the preparation and/or checking of activities required to place the LV distribution network in a state in which work can safely be performed whilst minimising customer outages and shall be demonstrated using the following:

LV Distribution feeders/distribution network; Transformers with LV windings; LV busbars; LV isolators; LV switchgear (applicable to enterprise equipment); switching instructions (applicable to enterprise equipment); computers (applicable to enterprise equipment); network diagrams (applicable to enterprise equipment); access authorities; regulatory requirements.

The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform

Assessing risk

Assessment

Authorisation

Confined space

Diagnostic, testing and restoration

Documenting detail work events, record keeping and or storage of information

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation

Environmental management documentation

Established procedures

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification

OHS practices

OHS issues

Permits and/or permits to work

Personnel

Quality assurance systems

Requirements

Testing procedures

Work clearance systems