NTISthis.com

Evidence Guide: UETTDRTP31A - Maintain energised transmission lines using high voltage live work stick method

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UETTDRTP31A - Maintain energised transmission lines using high voltage live work stick method

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare/plan to maintain energised transmission lines using high voltage live work stick method

  1. Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are obtained, analysed, if necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination.
  2. Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites.
  3. Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear, to ensure safe systems of work are followed and according to established procedures.
  4. Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures.
  5. Risk control measures are identified, prioritised and evaluated against the work schedule.
  6. Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.
  7. Resources including personnel, equipment, tools and personal protective equipment required for the job are identified, scheduled and coordinated and confirmed in a safe and technical working order.
  8. Relevant personnel at work site are confirmed current in First Aid, CPR, and other rescue procedures according to requirements.
  9. Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.
  10. Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures.
  11. Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures.
  12. Positioning of road signs, barriers and warning devices is planned in accordance with requirements.
Works schedule(s), including drawings, plans, requirements, established procedures, and material lists, are obtained, analysed, if necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant requirements and established procedures for the work are communicated to all personnel and identified for all work sites.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, OHS risks assessed and control measures are prioritised, implemented and monitored including emergency exits kept clear, to ensure safe systems of work are followed and according to established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk control measures are identified, prioritised and evaluated against the work schedule.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources including personnel, equipment, tools and personal protective equipment required for the job are identified, scheduled and coordinated and confirmed in a safe and technical working order.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel at work site are confirmed current in First Aid, CPR, and other rescue procedures according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is prepared according to the work schedule and to minimise risk and damage to property, commerce, and individuals in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Positioning of road signs, barriers and warning devices is planned in accordance with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out the maintenance of energised transmission lines using high voltage live work stick method

  1. OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures.
  2. First Aid, CPR and other Rescue procedures and other related work procedures are performed according to requirements and/or established procedures.
  3. Lifting, climbing, working aloft, and tools/equipment, techniques and practices are safely exercised according to requirements.
  4. Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures.
  5. Auto reclose devices associated with the circuits being worked on have been rendered inoperative and necessary work documentation acquired in accordance with enterprise requirements.
  6. Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and/or established procedures.
  7. Maintenance of energised high voltage overhead electrical transmission apparatus is carried out, in accordance with the work schedule and requirements and/or established procedures.
  8. Essential knowledge and associated skills are applied in the safe maintenance of energised high voltage overhead electrical transmission apparatus to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements.
  9. Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements.
  10. Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality like outcome is achieved for the client/customer and to a community/industry standard.
OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

First Aid, CPR and other Rescue procedures and other related work procedures are performed according to requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lifting, climbing, working aloft, and tools/equipment, techniques and practices are safely exercised according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard warnings and safety signs are recognised and hazards and assessed OHS risks are reported to the immediate authorised persons for directions according to established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Auto reclose devices associated with the circuits being worked on have been rendered inoperative and necessary work documentation acquired in accordance with enterprise requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance of energised high voltage overhead electrical transmission apparatus is carried out, in accordance with the work schedule and requirements and/or established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Essential knowledge and associated skills are applied in the safe maintenance of energised high voltage overhead electrical transmission apparatus to ensure completion in an agreed timeframe and, to quality standards with a minimum of waste according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality like outcome is achieved for the client/customer and to a community/industry standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the maintenance of energised transmission lines using high voltage live work stick method

  1. Work is checked against schedule for conformance, anomalies reported in accordance with established procedures.
  2. Accidents and /or injuries are reported and followed up in accordance with requirements/established procedures.
  3. Work site is rehabilitated, cleaned up and confirmed safe in accordance with established procedures.
  4. Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures.
  5. Relevant work permit(s) (live line) are signed off and client/customer advised in accordance with requirements.
  6. Works completion records, reports, as installed/modified drawing(s) and/or documentation and information are confirmed, processed and appropriate personnel notified.
Work is checked against schedule for conformance, anomalies reported in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Accidents and /or injuries are reported and followed up in accordance with requirements/established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is rehabilitated, cleaned up and confirmed safe in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant work permit(s) (live line) are signed off and client/customer advised in accordance with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Works completion records, reports, as installed/modified drawing(s) and/or documentation and information are confirmed, processed and appropriate personnel notified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

9) This provides essential advice for assessment of the unit of competency and must be read in conjunction with the Performance Criteria and the Range Statement of the unit of competency and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.

Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines – UET12”. Evidence shall also comprise:

A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and

Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit to such an extent that the learner’s performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and

Demonstrate an appropriate level of employability skills; and

Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:

Range of tools/equipment/materials/procedures/workplaces/other variables

Group No

The minimum number of items on which skill is to be demonstrated

Item List

A

At least two of the following:

Ladder access

EWP access

EWB access

Structure access

B

All of the following:

Electrical integrity of insulators

Replace strain insulators

Replace suspension insulators

C

At least three of the following:

Replace/install vibration dampers

Repair/replace conductor spacers

Repair/replace conductor fittings and hardware

Apply pre-formed helical fittings

Install/remove vibration meter

Replace crossarm

Replace pole/s

D

At least one occasion

Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual live line stick technique application on energised transmission lines.

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working at realistic heights above ground i.e. above 3 metres, in limited spaces, with different structural/construction types and method and in a variety of environments.

Method of assessment

9.4)

This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 “Assessment Guidelines”.

Note:

Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

There are no concurrent assessment recommendations for this unit.

Required Skills and Knowledge

8) Essential Knowledge and Associated Skills (EKAS): This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of maintaining energised lines (transmission) using live line stick technique.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-TTP31A Transmission live stick work for voltages from 66 kV up to 500 kV on structures and poles

Evidence shall show an understanding of working on energised lines for voltages from 66 kV up to 500 kV utilising live work stick method on structures and poles to an extent indicated by the following aspects:

T1 Commonwealth/State/Territory legislation, Standards, codes, supply authority regulations and or enterprise requirements associated with working on energised lines for voltages from 66 kV up to 500 kV utilising live work stick method.

T2 Relationship and responsibilities of each team member encompassing:

Roles of the individual in the team

Contribution to joint outcomes

Goals/plans and objectives of the team

Team communication

Effective teamwork

T3 Safety precautions for working on energised lines encompassing:

Live work minimum approach distances for persons and plant

Calculation of forces supported by live working equipment

Identification of OHS hazards, assessing and controlling risks

Types, selection, maintenance, storage and uses of personnel protective equipment required for live stick work

Types and functions, safe working policies, procedures and practices for use of specialised live work plant, equipment and tools

Emergency response and rescue

T4 Electrical and electrostatic principles encompassing:

Relationship of the resistance of a human body to different levels of current and voltage

Relationship of a human body to an electric field

Effects of electrostatic induction for live stick work

Relationship of phase voltage and respective line voltages

Effect of distance

Potential of an object within the field and the effect of distances to the potential

T5 HV feeder auto-reclosing suppression encompassing:

Function

Live work access authority/permit systems

T6 Selection care, use and maintenance of sticks for live work encompassing:

Care of live work sticks

Use and load limitations of live work sticks

Cleaning live work sticks

Restoring gloss surfaces of live work sticks

Repairing small ruptures of live work sticks

Repairing broken fittings of live work sticks

T7 Selection, care, use and maintenance of ropes for live work encompassing:

Identification of ropes used for live stick work

Characteristics

Types

Restrictions

Storage

Transport

Cleaning

Labeling

Testing

Records

Techniques in splicing

Determining suitability of the rope for continued use

T8 Live stick work techniques performed in accordance with enterprise requirements encompassing:

Connecting and/or disconnecting HV bypass bridges

Erect and use boom pole and insulator cradle

Erection and/or replacement of structures and poles

Installing and/or replacing HV cross-arms

Installing and/or replacing HV suspension insulators

Installing and/or replacing HV strain insulators

Installing and/or replacing suspension clamp unit

Installing and/or replacing fittings and hardware to conductors

Installing and/or replacing vibration dampers

Installing and/or replacing preformed repair rods

T9 Checking electrical integrity of insulators prior to work

Visual and audible assessment

Test for disc voltage difference

Plot data

Assess data

Determine condition of a insulator string

T10 Rigging procedures for live work encompassing

Identification of rigging points on structures

Selection and positioning of rigging equipment on structures

Selection of and operation of rope tackles

T11 Safety observer principles and responsibilities encompassing:

Areas of responsibility

Supervisor skills

Protocols and procedures

Specific duties of a safety observer

Techniques in observing others in the safe performance of their work

Minimum approach distances for personnel and hand held tools

Special Limits of Approach.

Range Statement

10) This relates to the unit of competency as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.

This Competency Standard Unit shall be demonstrated in relation to the maintenance of energised lines (transmission) using live line stick technique and includes the replacement of suspension and tension insulators, the calculating of conductor loads being both vertical and tension and conductor repairs.

Maintenance includes:

Live line Stick care and maintenance including mandatory testing.

Rope care and maintenance including mandatory testing.

Electrical testing of insulators.

Repair conductors.

The following constants and variables included in the element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)

Appropriate authorities

Appropriate work platform

Assessing risk

Assessment

Authorisation

Diagnostic, testing and restoration

Documenting detail work events, record keeping and or storage of information

Drawings and specifications

Emergency

Environmental and sustainable energy procedures

Environmental legislation

Environmental management documentation

Established procedures

Fall prevention

Hazards

Identifying hazards

Inspect

Legislation

MSDS

Notification

OHS practices

OHS issues

Permits and/or permits to work

Personnel

Quality assurance systems

Requirements

Testing procedures

Work clearance systems