Install drainage systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AHCDRG301, 'Install drainage systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Install drainage systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for drainage system installation activities

1.1 Identify the construction site for the drainage system

1.2 Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

1.3 Identify work health and safety hazards, assess risks and implement controls

1.4 Select, use and maintain suitable personal protective equipment

2. Co-ordinate installation work

2.1 Coordinate work tasks in a sequential, timely and effective manner

2.2 Install the drainage system with due consideration of the environmental implications

2.3 Maintain a clean and safe work area throughout work

3. Prepare the site for installation of drainage system

3.1 Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

3.2 Identify layout of services, check depths and report discrepancies

3.3 Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

4. Undertake installation of drainage system

4.1 Complete excavations without damage to services, facilities, features and established plants

4.2 Install the drainage system

4.3 Test the drainage system for configuration, flow rates and capacity

4.4 Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

5. Complete installation of drainage system

5.1 Finish earthworks

5.2 Restore the site and remove and dispose of waste material

5.3 Clean, maintain and store tools, equipment and machinery

5.4 Record work outcomes and report the works as per the executed drawings, including adjustments


Qualifications and Skillsets

AHCDRG301 appears in the following qualifications:

  • AHC33210 - Certificate III in Floriculture
  • AHC30610 - Certificate III in Production Horticulture
  • AHC30910 - Certificate III in Landscape Construction
  • AHC32412 - Certificate III in Irrigation
  • AHC30110 - Certificate III in Agriculture
  • AHC30616 - Certificate III in Production Horticulture
  • AHC33216 - Certificate III in Floriculture
  • AHC31316 - Certificate III in Sports Turf Management
  • AHC30116 - Certificate III in Agriculture
  • AHC32416 - Certificate III in Irrigation
  • AHC30916 - Certificate III in Landscape Construction