Carry out installation tasks for sprinkler irrigation

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AHCIRG210A, 'Carry out installation tasks for sprinkler irrigation'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Carry out installation tasks for sprinkler irrigation' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1 Prepare for work on installing sprinkler irrigation systems

1.1 The required materials,tools and equipment are identified according to lists provided and/or supervisor's instruction

1.2 Techniques used when loading and unloading materials demonstrate correct manual handling and minimise damage to the load and the vehicle

1.3 Suitable personal protective equipment(PPE) is selected and checked prior to use

1.4OHS hazards are identified and reported to the supervisor

2 Assemble and lay out components

2.1 Equipment is checked to confirm readiness for use

2.2 Materials are selected according to instructions

2.3 Irrigation components are laid out in accordance with instructions

2.4 Trenches are dug or tidied up in accordance with instructions where required

3 Install irrigation components

3.1 Pipeline is joined or finished according to instructions

3.2System components are added or inserted according to instructions

3.3 Lines are positioned and secured according to instructions

3.4 Pumps and valves are fitted according to instructions

4 Complete installation activities

4.1 The irrigation system is commissioned and observed

4.2 Problems and anomalies are recognised and reported

4.3 Equipment is cleaned and stored according to instructions

4.4 Materials are stored according to instructions

4.5 Waste is collected and disposed of or recycled according to workplace procedures

4.6 Workplace information is recorded in the appropriate format


Qualifications and Skillsets

AHCIRG210A appears in the following qualifications:

  • AHC21112 - Certificate II in Irrigation