Implement a low volume irrigation maintenance program

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AHCIRG316A, 'Implement a low volume irrigation maintenance program'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Implement a low volume irrigation maintenance program' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1 Interpret a low volume irrigation maintenance program

1.1 Scope of maintenance works is determined according to the irrigation maintenance program

1.2 Frequency of maintenance works is determined and implemented according to the irrigation maintenance program

1.3 Irrigation maintenance standards are established in line with the irrigation maintenance program

1.4 Maintenance works are planned and prepared

1.5 Occupational Health and Safety (OHS) requirements are identified, associated hazards and risks assessed, and suitable controls implemented

1.6 Environmental considerations of irrigation maintenance activities are identified

2 Inspect a low volume irrigation system

2.1 An inspection checklist is established according to the irrigation maintenance program

2.2 System is regularly inspected according to the checklist

2.3 Remedial action and repairs are identified and undertaken to restore system to full effectiveness

2.4 Servicing of mechanical equipment is undertaken according to the irrigation maintenance program

2.5 Results of maintenance works are assessed and recorded to ensure repairs or maintenance standards have been achieved according to the irrigation maintenance program

2.6 Surroundings are tidied and materials and equipment cleared from the site on completion of maintenance works

3 Carry out periodic system maintenance

3.1 Damage and blockages with contaminants are recorded by damage type, location and the section of the system affected

3.2 Damaged or faultycomponents and computer control systems are recorded and reported, and action taken to effect repairs

3.3 The system is chlorinated as per procedures

3.4 Filters are checked, cleaned and backflushed

3.5 Submains and laterals are flushed

4 Record and report maintenance activities

4.1 Maintenance and servicing records are completed

4.2 Parts removed and/or replaced are recorded

4.3 Faults and breakages are recorded or reported


Qualifications and Skillsets

AHCIRG316A appears in the following qualifications:

  • AHC32412 - Certificate III in Irrigation