Construct and install a sprinkler irrigation system

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AHCIRG412A, 'Construct and install a sprinkler irrigation system'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Construct and install a sprinkler irrigation system' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1 Develop and implement construction procedures

1.1 Employment procedures and contract management procedures are developed

1.2 Procedures for controlling and recording site deliveries are established

1.3 Procedures for recording the hire of plant and equipment are determined

1.4 OHS procedures are established, including risk assessment

1.5 Client, authorities and agencies are notified of the schedule of works

1.6 Procedures for dealing with environmental issues associated with construction work are determined

2 Interpret the sprinkler irrigation systemdesign for the site

2.1 The purpose, scale and required output of the irrigation system is determined

2.2 The landscape of the site is assessed

2.3 Construction requirements are determined and verified with the designer

2.4 Components are selected to meet design specifications and site requirements

3 Organise resource requirements

3.1 Tasks and timelines are nominated with resources required for each

3.2 Labour requirements are organised

3.3 Parts and equipment are delivered to the site and checked

3.4 Equipment and machinery is selected and maintained

3.5 Jobs and tasks are allocated to the work team

3.6 Safety induction is carried out for the task and site

4 Supervise installation and construction

4.1 Plan is interpreted and installers are supervised and work is monitored to conform to the plan.

4.2 Components are assembled and connected according to the plan, and joints are completed and tested according to manufacturer specifications.

4.3 Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.

4.4 Pumping system is installed and tested

5 Complete installation work and test components

5.1 Water supply is connected

5.2 The system is started up and flushed

5.3 Sprinklers are checked for optimal coverage and efficiency

5.4 Measuring devices and controllers are attached to the system

6 Commission system

6.1 Operating faults are identified and corrective actions taken to meet design specifications

6.2 Testing/monitoring equipment is calibrated to manufacturer’s specifications

6.3 Pressure testing is carried out and compared to specifications

6.4 Adjustments are made as required

6.5 The system is handed over in compliance with design specifications