Set up, operate and maintain water delivery systems for compost

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AHCWAT201A, 'Set up, operate and maintain water delivery systems for compost'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Set up, operate and maintain water delivery systems for compost' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Set up a water delivery system

1.1. Requirements for set up of water delivery system and application methods to be used are obtained from supervisor and clarified if required.

1.2. Details of location to which water is to be delivered are confirmed with supervisor and any regulations covering use of site are noted and observed.

1.3. Hoses, tools and equipment and components appropriate to particular water delivery system being set up are selected and correctly used.

1.4. Appropriate water sources on site are identified.

1.5. Occupational Health and Safety (OHS) hazards associated with task are identified and appropriate action is taken to minimise risks to self and others.

1.6. Water delivery lines, where required, are measured and marked out according to instructions.

1.7. Water delivery system is set up according to instructions and enterprise procedures.

2. Operate a water delivery system

2.1. Water delivery is commenced as instructed.

2.2. Water application rate is set according to enterprise procedures.

2.3. Pipes, hoses and all joints are checked and confirmed to be secure and leak free.

2.4. Pumps are operated and checked according to manufacturer instructions and enterprise procedures.

2.5. Remedial action is taken if required and according to enterprise guidelines and supervisor instructions.

3. Check the efficiency of a water delivery system

3.1. Water application rate and distribution are checked according to enterprise procedures.

3.2. Water delivery system is visually inspected for operating faults and dry areas, and observations are recorded in maintenance log.

3.3. Variations from required rate or settings, or leaks, operating faults and dry areas observed at any stage in process are reported to supervisor.

3.4. Remedial action is carried out as directed by supervisor and according to enterprise procedures.

3.5. Amounts of water delivered to location are recorded according to enterprise procedures.

3.6. Work outcomes are reported to supervisor, feedback on performance is sought and any required improvements are noted for future action.


Qualifications and Skillsets

AHCWAT201A appears in the following qualifications:

  • AHC20110 - Certificate II in Agriculture