Manufacture or modify plant, tooling, equipment or systems

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver AUMATK4010, 'Manufacture or modify plant, tooling, equipment or systems'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Manufacture or modify plant, tooling, equipment or systems' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan manufacture or modification of plant, tooling, equipment or systems

1.1. Applicable OHS and organisation requirements relevant to the manufacture or modification of plant, tooling, equipment or systems are verified and complied with throughout the work activity

1.2. Instructions and plans are read and interpreted to identify processes and materials to complete work tasks

1.3. Requirements of the client for manufacture of, or modification to plant, tooling, equipment and/or systems are assessed/re-checked in conjunction with engineering staff

1.4. Approval is sought for the planned manufacture or modifications in accordance with organisational requirements and any necessary changes made

1.5. Steps involved in the manufacture of, or modifications to plant, tooling, equipment and/or systems are identified in consultation with designated staff

1.6. An inventory of required equipment, parts and components is established in accordance with organisational procedures, including an assessment of their current availability or the need to either manufacture, purchase or lease them.

1.7. Fabrication/machining processes and instructions are determined and clarified with participating departments/sections/areas

1.8. Timetable, budget, resource requirements, staffing and purchase/supply schedule for the modification of plant, tooling, equipment and/or systems are drawn up and confirmed in consultation with designated staff

1.9. Approved plan is communicated to all relevant staff in management, production, engineering and other sections of the organisation concerned

2. Make parts for plant, tooling, equipment or systems

2.1. Specifications for parts are interpreted to determine the dimensions and processes for manufacture or modification

2.2. Required raw materials, tools, equipment and assembly or fabrication jigs or fixtures are selected and prepared for the particular specification requirements

2.3. Components or parts are manufactured or modified in accordance with the required specifications

2.4. Test equipment and rigs are used, where applicable, to confirm serviceability of finished tools, jigs or fixtures

2.5. Completed parts are tagged, sealed and/or packaged as required and dispatched to the store or assembly area

3. Manufacture or modify tools, jigs and/or fixtures

3.1. Specifications for modifications of tools, jigs and/or fixtures are interpreted to determine the dimensions and processes for manufacture or modification

3.2. Required raw materials, tools, equipment and assembly or fabrication jigs are selected and prepared for the particular specification requirements

3.3. Modifications are conducted in accordance with the required specifications

3.4. Test equipment and rigs are used, where applicable, to confirm serviceability of finished tools, jigs or fixtures

3.5. Completed tools, jigs or fixtures are tagged, sealed and/or packaged as required and despatched to the store or relevant production area

4. Cast, fabricate, machine, assemble and/or wire modified plant, tooling, equipment or systems

4.1. Specifications for manufactured or modified plant, tooling, equipment and/or systems are interpreted to determine the dimensions and processes for manufacture or modification

4.2. Required raw materials, parts, sub-assemblies, tools, equipment and assembly or fabrication jigs are selected and prepared for the particular specification requirements

4.3. Plant, tooling and equipment is cast, fabricated, machined, assembled and/or wired

5. Check/test manufactured or modified plant, tooling, equipment and/or systems

5.1. Test equipment and rigs are used, where applicable, to confirm serviceability of manufacture or modified plant, tooling and equipment

5.2. Completed plant, tooling and equipment is tagged, sealed and/or packaged as required and dispatched to the store or production area

6. Document manufacture or modifications to plant, tooling, equipment or systems

6.1. Manufacturing details or modifications to the plant, tooling and equipment are documented

6.2. Documentation is stored and/or distributed to required personnel


Qualifications and Skillsets

AUMATK4010 appears in the following qualifications:

  • AUM40112 - Certificate IV in Automotive Manufacturing