Construct pitched roofs

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCCCA3007B, 'Construct pitched roofs'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Construct pitched roofs' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare.

1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.

1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.

1.3. Signage and barricade requirements are identified and implemented.

1.4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.

1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.

1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.

2. Set out and prepare members for pitched roof erection.

2.1. Set out for position of members is checked against top of plates in accordance with drawings and specifications.

2.2. Pattern rafter is set out and cut to length allowing for overhang.

2.3. Main ridge boards are marked and cut to length.

2.4. Common rafters are cut to length and checked.

2.5. Common rafters are erected in correct sequence.

2.6. Bevels and lengths for hip and valley rafters are determined from pitch of roof.

2.7. Hip and valley rafters are cut and fixed.

2.8. Creeper rafters are cut and fixed from pattern rafter allowing for overhang.

3. Install roof support.

3.1. Bevels and lengths for under purlins are determined.

3.2. Under purlins are cut and installed.

3.3. Struts are measured, cut and installed to under purlins, hips, valley and ridges to regulation.

3.4. Collar ties are installed to regulatory requirements.

3.5. Trimmers are fitted to gable ends to take gable end rafter and barge board.

3.6. Valley boards are cut and fixed.

4. Clean up.

4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.