Operate a crushing plant

Formats and tools

Unit Description
Reconstruct the unit from the xml and display it as an HTML page.
Assessment Tool
an assessor resource that builds a framework for writing an assessment tool
Assessment Template
generate a spreadsheet for marking this unit in a classroom environment. Put student names in the top row and check them off as they demonstrate competenece for each of the unit's elements and performance criteria.
Assessment Matrix
a slightly different format than the assessment template. A spreadsheet with unit names, elements and performance criteria in separate columns. Put assessment names in column headings to track which performance criteria each one covers. Good for ensuring that you've covered every one of the performance criteria with your assessment instrument (all assessement tools together).
Wiki Markup
mark up the unit in a wiki markup codes, ready to copy and paste into a wiki page. The output will work in most wikis but is designed to work particularly well as a Wikiversity learning project.
Evidence Guide
create an evidence guide for workplace assessment and RPL applicants
Competency Mapping Template
Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners. A template for developing assessments for a unit, which will help you to create valid, fair and reliable assessments for the unit, ready to give to trainers and students
Observation Checklist
create an observation checklist for workplace assessment and RPL applicants. This is similar to the evidence guide above, but a little shorter and friendlier on your printer. You will also need to create a seperate Assessor Marking Guide for guidelines on gathering evidence and a list of key points for each activity observed using the unit's range statement, required skills and evidence required (see the unit's html page for details)

Self Assessment Survey
A form for students to assess thier current skill levels against each of the unit's performance criteria. Cut and paste into a web document or print and distribute in hard copy.
Moodle Outcomes
Create a csv file of the unit's performance criteria to import into a moodle course as outcomes, ready to associate with each of your assignments. Here's a quick 'how to' for importing these into moodle 2.x
Registered Training Organisations
Trying to find someone to train or assess you? This link lists all the RTOs that are currently registered to deliver CPCCDE3013A, 'Operate a crushing plant'.
Google Links
links to google searches, with filtering in place to maximise the usefulness of the returned results
Books
Reference books for 'Operate a crushing plant' on fishpond.com.au. This online store has a huge range of books, pretty reasonable prices, free delivery in Australia *and* they give a small commission to ntisthis.com for every purchase, so go nuts :)


Elements and Performance Criteria

ELEMENT

PERFORMANCE CRITERIA

1. Plan and prepare.

1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.

1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.

1.3. Signage and barricade requirements are identified and implemented.

1.4. Plant, equipment and tools are selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

1.5. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

2. Prepare for crushing operations.

2.1. Crushing plant daily schedule and the size and type of materials to be crushed are determined from work/supply schedule.

2.2. Crushing plant is visually inspected for correct operational condition as per manufacturer requirements.

2.3. Daily or other periodic maintenance is carried out in accordance with plant maintenance schedule and manufacturers' instructions.

2.4. Faults are identified and corrected or reported to supervisor.

2.5. Plant is prepared and set for initial size range of crushings.

3. Operate crushing plant.

3.1. Crushing plant and equipment are operated and tested for correct operation as per manufacturer specifications.

3.2. Uncrushed materials are directed into hopper and feed of uncrushed materials is maintained according to manufacturers' instructions.

3.3. Crushing plant is stopped, cleared of blocked materials and restarted in accordance with manufacturers' instructions and site safety plan.

3.4. Crushing plant settings are maintained in accordance with manufacturers' instructions.

4. Shut down plant.

4.1. Crushing plant is shut down in accordance with manufacturers' instructions and site safety and operation plan.

4.2. Faults identified are reported to supervisor and plant is tagged in accordance with workplace procedures.

5. Clean up.

5.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

5.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.


Qualifications and Skillsets

CPCCDE3013A appears in the following qualifications:

  • CPC30411 - Certificate III in Demolition
  • CPC30411 - Certificate III in Demolition